Laserfiche WebLink
AfAILINC ADDRESS. PHYSICAL ADDRESS: <br /> STATE WATER RESOURCES CONTROL STATE WATER RESOURCES CONTROL <br /> DIVISION OF FINANCIAL ASF %NCE DI' ON OF FINANCIAL ASSISTANCE <br /> UST CLEANUP FUND !mow/ US,.r.LEANUP FUND <br /> P.O.BOX 944212 1001 1 STREET <br /> SACRAMENTO,CA 94244-2120 SACRAMENTO,CA 95814 <br /> COST PRE-APPROVAL REQUEST <br /> (Complete form, enclose required items,sign,date and return) <br /> Mail to: USTCF, PO Box 944212, Sacramento,CA 94244 or Fax to: (916)341-5806 <br /> I. CLAIM INFORMATION <br /> Claim No.CP 0034 County or Regional Board: RWQCB-CVR Central Valley <br /> Claimant: Chevron Environmental Management Company <br /> Contact Person: Darin Rouse Phone: (925) 842-1572 <br /> Address: 6001 Bollinger Canyon Road Fax: (925) 842-8370 <br /> San Ramon, CA 94583 E-mail: <br /> Consultant: SECOR International Phone: (916) 861-0400 <br /> Address: 3017 Kilgore Road#100 Fax: (916) 861-0430 <br /> Rancho Cordova, CA 95670 E-mail: bcarey@secor.com <br /> II. TYPE OF REQUEST(check appropriate boxes) <br /> X❑ Pre-Approval $60,975.00 Amount Requested <br /> ❑ 3-Bid Review $ Preferred Bid(if applicable) <br /> © The Cleanup Fund is authorized to transmit pre-approval information to my consultant. <br /> THE FOLLOWING DOCUMENTS ARE REQUIRED FOR THE SPECIFIED REQUEST. ALL DOCUMENTS <br /> REQUESTED MUST BE SUBMITTED OR THE REQUEST(S) WILL BE RETURNED UNPROCESSED. <br /> A. Request for Pre-Approval of Proposed Costs—The following items are required before review and <br /> determination will be made by Fund Staff <br /> 1. _ A complete signed copy of the proposed Investigation Workplan or Corrective Action Plan(CAP)(as <br /> defined and required by Article 11,Chapter 16,California Underground Storage Tank Regulations). <br /> Corrective Action Plans must include the required feasibility study and chosen cost-effective alternative. <br /> 2. _ A signed copy of the oversight agency approval letter for the Workplan/CAP. <br /> 3. _ A complete copy of the Request for Bids, including all attachments. <br /> 4. _ Complete copies of all bids(including subcontractor bids)and other correspondence submitted in <br /> response to the Request for Bids. <br /> 5. _ A time schedule, if not part of bid documents,anticipated for project initiation and duration. <br /> 6. X A detailed project budget,which includes breakdowns of staff/task/hour with associated estimated totals. <br /> B. Three-Bid Review/Evaluation/Determination—Fund staff will assist any claimant requesting an evaluation of <br /> bids upon request. The following information must be submitted— 1, 2, 3,and 4 as described in Item A <br /> above. <br /> III. CERTIFICATION <br /> I certify under penalty ofperjury that all information submitted is,ith this request is complete and accurate and in <br /> accordance with all applicable laws and regulations. I further cerli6-that the titi,urk requested under/his pre- <br /> approval Inas ,t been implemerrled. Must be signed by claimant orperson desi.znated on the Power ofAttornev <br /> nature Printed Name Date <br /> Revised'12-05-03 <br />