My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:09:00 PM
Creation date
2/6/2019 4:14:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> page 2, 2905 Ben Holt Drive <br /> The Work Plan further proposes the installation of three groundwater extraction wells. <br /> However, in conversation with SECOR on April 13, 2001 it was understood by <br /> PHS/EHD that Chevron wishes to delay consideration of the need for extraction wells <br /> until evaluation of the CPT and sentry well data is completed. <br /> Following completion of the fieldwork and laboratory analyses, a report will be prepared <br /> which will provide a site conceptual model, calculations for mass flux and mass <br /> discharge, all data and data analysis, and findings and recommendations supporting the <br /> need for further work. <br /> A proposal was made to conduct monthly sampling of the Municipal Well No. 10 for a <br /> period of six months to determine the reproducibility of the MtBE detections. PHS/EHD <br /> discussed this proposal with the City of Stockton Public Works Department. The Public <br /> Works personnel seemed receptive to the proposal and indicated that coordination of <br /> that effort with SECOR was possible. It is the understanding of PHS/EHD that SECOR <br /> is currently working on making the necessary arrangements for the next sampling event. <br /> The Work Plan as outlined above is approved. Please proceed with submittal of a well <br /> permit application and required $89.00 permit fee for each parcel of land on which <br /> drilling will occur, as well as all necessary encroachment permits and/or access <br /> agreements from off-site property owners. The report of findings must be submitted to <br /> PHS/EHD within 60 days following completion of the fieldwork. <br /> If you have any questions or comments call Lori Duncan at (209)468-0337. <br /> Donna Heran, RENS, Director <br /> Environmental Health Division <br /> Loi'k Gt L�v�nc�t <br /> Lori Duncan, Senior REHS Dot Lofstrom, RG <br /> LOP/Site Mitigation Unit IV LOP/Site Mitigation Unit IV <br /> cc: Marty Hartzell, CVRWQCB <br /> Scott Gable, SECOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.