Laserfiche WebLink
� n <br /> - In- MWIN'. <br /> s' <br /> WLSTERNGEOLOGIC RESOURCES , INC. <br /> STANDARD OPERATING PROCEDURES <br /> ME— R.E.GROUNDWATER PURGING AND SAM UNG <br /> SOP-4 <br /> j <br /> r <br /> 1 <br /> I <br /> Prior to water sampling, each well is,purged by evacuating a minimum of three well-casing <br /> volumes of groundwater or until the discharge water temperature,conductivity,and pH stabilize. The <br /> ' groundwater sample should be taken when the wafer leve[in the well recovers to&I%of its static level, <br /> � F <br /> 1 <br /> The sampling equipment used consists of either a Ieflon bailer or a stainless steel bladder pump i[ <br /> 1; <br /> with a t;ilon bladder. If the,ampling rystem is dedicated to the well,[hen the bailer is made of teflon, r <br /> but the bladder pump is PVC with a polypropylene bladder. Fort 1 <br /> y milliliter(ml)glass volatilc•organtc• ; <br /> analyss(VOA)vials,with,eflon septa,are used as sample containers, j <br /> I1 <br /> j <br /> The groundwater sample is decanted into each VOA vial in such a manner!hat there is a <br /> 4 meniscus at the top of the vial. The cap is quickly placed over the top of the vial and sxurely tightened. <br /> it <br /> The VOA vial is then inverted and upped to see if air bubbles are present. If none are present, the <br /> sample is labeled and refrigerated for delivery under chain-Of-custody to the laboratory. label <br /> i <br /> information should include a sam[tic identification number,job identification nu,nber,date,time,type t <br /> of analysis requested,and the sampler's name. <br /> For quality control purwses,a duplicate water sample is collected from each well. This sample <br /> is put on hold at the laboratory. A trip blank is prepared tst the laboratory and placed in the transport, <br /> co-Pler-., It remains with the cooler and is analyzed by the laboratory along with the groundwater <br /> samples. A Geld blank is prepared in the field whop sampling equip <br /> t pot dedicated, The field t <br /> blank;s prepared after a pump or bailer has been steam-cleaned <br /> prior to use in a second well,and is menis <br /> analyzed along with the other samples. The Geld blank demons <br /> prtrates the quality of in•fitld cleaning <br /> procedures to prevent cross-contamination. <br /> To minimize the potential for cross•ccr.:amination between wells,all the well-development and t <br /> water-sampling equipment that is not dedicated to a well is stcatn•cicaned between each well, As 1 <br /> secoCd rCeanliOp }I <br /> P ary measure, wells will b- sampled in order of least to highest concentrations t+s <br />` established by previous analyses. <br />