My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012551
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0012551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:08:17 PM
Creation date
2/6/2019 4:29:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012551
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N%rJ: STLRNG110LOGIC R [:sau4ct:s , INC . <br /> 'M E.FRANCISCO nOCLF.ti'ARD,SUITE It ' <br /> SAV RAFAEL.CALIFORNIA 94901 <br /> 415,457.7595 FAX:415,457.8511 <br /> APR �a <br /> 3 April 1990 <br /> Jahn Randall <br /> Chevron USA <br /> 2410 Camino Ramon <br /> 3� San Ramon,CA 94583 <br /> Rc: Quarterly Groundwater Monitoring <br /> Sampled 18 December ?989 <br /> Chevron Service Station#94275 <br /> - Stockton,California <br /> .,: WGR Project#1-104.06 <br /> Dear Mr.Randall: <br /> This lett,..;lrepnrt presents the results of the groundwater sampling performed in Dccembrr <br /> 1989 by Western Geologic Resources,Inc (WGR)at&c Chevron scnice station #94275,located at <br /> ` � 2905 W.-Benjamin Holt Drive,Stockton,California(Figure 1). <br /> GROUNDWATER SAMPLING <br /> #':K• Wells MW-I through MW-5 were sampled on 18 December 1989 by WGR environmental <br /> teehniciaus according to the WGR standard operating procedure fer groundwater sai tpUng included as <br /> Attachment A. All purged water was collected and temporarily stored ch-site in holding tanks pending <br /> S' results of Lbvratory analysts. The groundwater samples and laboratory supplied travel blanks,made <br /> up of deionized water at the laboratory,were sent under chain-of-custody to Pace Laboratories,Inc. <br /> (PACE)of Novato,California. <br /> ANALYTIC RESULTS <br /> All groundwater samples,collected on 18 December 1989,were analyzed for total purgeable <br /> fuel hydrocarbons(TPFH),by EPA Method 8015 and b rtmne,toluene,c[hylbenzcne,and total xylenes <br /> (BTF_X)by EPA Method 8020. Additionally,a sample collected from well MW-'was analyzed for <br /> haloczrbons by EPA Method 8010. The analytic results are presented in Table 1. The chain-of-custody, <br /> form, laboratory mpnrts and quality assurance/quality control documentation are included as <br /> Attachments B and C. The distribution of TPFH and benzene in groundwater is shown in Figures 3 <br /> and 4,respectively. <br /> i� - <br />
The URL can be used to link to this page
Your browser does not support the video tag.