Laserfiche WebLink
�1_N-17-010 <br /> GR <br /> WESTERN GEOLOGIC RESOURCES INC. <br /> STANDARD OPERATING PROCEDURES <br /> RE:HOLLOW STEMAUGER MONITORING WELL INSTALLATIONAND DEVELOPMENT <br /> SOP <br /> The boreholes for monitoring wells are drilled using a truck.mounted hollow-stem-auger drill rig. <br /> The outside diameter(O.D.) of the borehole will be a minimum of two inches larger than the outside <br /> diameterwhen installing4-inwell screen.The hollow stem augerprovidcsminimal interruption ofdrilling <br /> while permitting soil sampling at desired intervals. Soil samples are collected by hammering a <br /> conventional split barrel sampler containing pre-cleaned 2-in brass sampia tubes.A geologist from <br /> Western Geologic Resources (WGR) continuously logs each borehole durinb,drilling and constantly <br /> checks drill cuttings for odors. The sampler is rinsed between samples and steam-cleaned with all other <br /> drilling equipment between borings to prevent cross contamination. <br /> Monitoring wells are cased with threaded,factory perforated and blank scheduled 40 PVC.The <br /> perforated interval consists of slotted casing generally 0.020-in slot size by 1.5-in long with 42 slots per <br /> foot.A PVCeap is fastened to the bottom of the casingwith stainless steel screws;no solvents or cements <br /> are used.Centering devices may be affixed to the casing to assure even distribution of filter material and <br /> grout.The well casing is thoroughly washed and steam-cleaned prior to installation. <br /> After setting the casing inside the hollow stem,sand or gravel filter material is poured into the <br /> annular space to fill from the bottom of the boring to 1 ft.above the perforated interval. A 1 to 2 foot <br /> thick bentonite.plug is placed above this filter material to prevent grout from infiltrating down into the <br /> filter material. Neat cement containing about 5%bentonite is then tremied into the annular spate above <br /> the bentonite plug to the surface.A lockable PVC cap is placed on each well'head. Traffic rated Christy <br /> boxes are installed around the well for wells in parking lots and driveways while steel stove pipes are set <br /> L over wells in'.andscaped areas. <br /> After installation,the wells are thoroughly developed to remove residual drilling materials from <br /> the wellbore and to improve well performance by removing any fine material in the filter pack that can <br /> pass from the formation into the well. Well developmer;t techniques used include pumping, bailing, <br /> surging,swabbing,jetting,flushing and airlifting. All development water is collected in 55 gallon drums <br /> for temporary storage and analytic results. The developed water is then disposed of properly according <br /> to analytic results. To assure that cross contamination does not occur between wells during drilling and <br /> development,all development is steam-cleaned. <br /> �' SOP-3;Oct/88 <br />