My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012551
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0012551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:08:17 PM
Creation date
2/6/2019 4:29:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012551
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WGR <br /> WESTERN GEOLOGIC RESOURCES INC. <br /> STANDARD OPERATING PROCEDURES <br /> RE:GROUND WATER SAMPLING <br /> SOP <br /> Prior towater sampling,each welI is purged by evacuating a minimum of three well bore volumes <br /> of ground water or until the discharge water temperature,conductivity,and pH stabilize. The ground <br /> water sample should be taken when'he water level in the well recovers to 80%of its static level. <br /> The sampling equipment used consists of teflon bailer or a stainless steel bladder pump with a <br /> teflon bladder. If the sampling system is dedicated to the well,then the bailer is made of teflon but the <br /> bladder pump is PV Cwith a nolypropylene bladder.40 ml glassvolatile organic analysis(VOA)vials with <br /> teflon septa are used for sample containers. <br /> The ground water sample is decanted into each VOA vial in such a manner that there is a minicus <br /> at the top of the vial. The cap is quickly placed over the top of the vial and tightened securely. The VOA <br /> vial is then inverted and tapped to see if air bubbles are present. If none are present the sample is labeled <br /> and refrigerated for delivery under chain of custody to the laboratory.Label information should include <br /> a sample identification number,job identification number,date,time,type of analysis requested and the <br /> sampler's name. <br /> For quality cor:rol purposes a duplicate water sample is collected for each well. This sample is <br /> held at tbelaboratoryualess neEded.A trip blank is prepared at the laboratory and placed in the transport <br /> cooler..It remains with the cooler and is analyzed by the laboratory along with the ground water samples. <br /> A.fie?.d blank is prepared in the field when sampling equipment is not dedicated. It is prepared after a <br /> pump or bailer has been steam-cleaned,prior to use in a second well and is analyzed alongwith the other <br /> samples. The field bland demons:rates the quality of field cleaning procedures to prevent <br /> cross-contamination. <br /> To minimize the potential for cross-contamination between wells,all the well development and <br /> water sampling equipment that is not dedicated to the well is steam-cleaned between each well. As a <br /> second precautionary measure, wells will be sampled in order of least to highest concentrations as <br /> established by previous analysis. <br /> ... S0P4;0cr/88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.