My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012551
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0012551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:08:17 PM
Creation date
2/6/2019 4:29:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012551
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sr, <br /> CROZ7ND ATER TE*WoL CY <br /> STA.NDk-FLD OPERATING PROCEDURE <br /> CONCMMING MONITORING tt'ELL INST),LLXTTON <br /> SOP 13 <br /> The boreholes for the monitoring wells shall be drilled <br /> using a truck mounted hollow stem auger drill rig. The <br /> outside diameter (O.D.) of the auger should be at minimum <br /> of eight inches when installing 4-inch well atcraen. The <br /> hollow stem auger provides minimal interuption of drill- <br /> ing while permitting soil sampling at specific intervals. <br /> Soil samples can be taken at desired depths by hammering <br /> a conventional split barrel sampler containing precleaned <br /> 2 inch brass sample tubes. <br /> The construction details of the monitoring wells to be <br /> drilled at the site are graphically depicted in the <br /> r_ttached figure titled "Typical Detail of Monitoring Well <br /> Construction" (See Figure 1) . The wells should be cons- <br /> tructed of 4 inch PVC, .020 inch machine slotted screen <br /> and blank casing. The screened portion of the well will <br /> extend 5 feet above and 10 feet below the present wuter <br /> table. An appropriate sand pack as determined by grain <br /> size analysis shall be placed in the annular space between <br /> the casing and drilled hole to inhibit silt buildup around <br /> the well. An annular seal installed above the sand pack <br /> should consist of bentonite pellets overlain by neat <br /> cement or cement grout to the surface. The wellhead shall <br /> be protected below grade within a traffic rated street box. <br /> Each well shall have a permanently attached identification <br /> plate containing the following information (1) Well Number, <br /> (2) wellhead Elevation, (3) Depth of well, (4) Screened <br /> Interval. <br /> Subsequent to installation the wells shall be developed <br /> to remova silts and improve well performance. The well <br /> development shall be conducted by air lifting the water <br /> r within the well until groundwater pumped from the wells <br /> is silt free. <br /> To assure that cross contamination does not occur between <br /> the drilling and development of successive wells all <br /> equipment contacting subsurface soils or ground water <br /> shall be steam cleaned. The steam cleaned equipment <br /> should include but not limited to the following (1) Dril- <br /> ling Augers, (2) Split Barrel Sampler, (3) Groundwater <br /> Monitoring and Sampling Equipment, (4) Well Development <br /> Piping and Sparging Equipment. <br /> GRnI"Y(ri.'4TER <br /> TECHtiuI. i.Isc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.