Laserfiche WebLink
& <br /> • SOIL VAPOR EXTRACTION SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> • U <br /> Date: Time of Arrival: <br /> Technician: C_ Time of Departure: <br /> Site Engineer: Scott Gable Was Site Engineer or substitute tatted from field? <br /> Yes No <br /> PART A:GENERAL INFORMATION <br /> Site Location: 290,9 B n•amin Holt Drive Stockton CA Station No.: Chevron#9-4275 <br /> Project No. 077.43508.550 <br /> Abatement Equip.: Kingbuck <br /> Serial No.: <br /> SVE Blower: Sutorbilt Max AMP Rating: <br /> SPG Blower: Gast <br /> MAX AMP Rating: 10 <br /> Telemetry: None <br /> Electrical Power:220 V 3 Phase <br /> Elect. Meter Reading: <br /> Supplemental Fuel: Supp.Fuel Meter Reading: ~L <br /> No.of WO barrels at site: Full --> Empty <br /> PART B:SVE SYSTEM DATA !/ f/ J� <br /> System up or down upon arrival: G'� dawn please complete PART E) <br /> Hourrneter Reading: "'�~ At time: <br /> Flaw Data Before Ad'ustment Final Ideal Ran e <br /> %Dilution air valve open <br /> %Recirculation valve open <br /> K/O Content I <br /> Vacuum 0 blower(in H2O) <br /> Gauae Range <br /> AMPS drawn by blower motor AMPS <br /> Total System Flow(A P,in H2O) <br /> Pipe Size " <br /> Well Fleld Air Flow(A P,in H2O) <br /> Pipe Size 4" <br /> Dilution Air Raw(A P,"H2O) <br /> Pipe Size " <br /> il) <br /> FID Data WC/WOC/DF WC/WO ,/DF Ideal Ran e <br /> System Influent my Before dilution <br /> System Influent my after dilution <br /> S stem Effluent my <br /> • Field Instrument Used: Last Calibrated: <br />