My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000312
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0000312
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:12:43 PM
Creation date
2/6/2019 4:40:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000312
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date February 15, 2001 r COR <br /> International Incorporated <br /> CHEVRON QUARTERLY GROUNDWATER MONITORING REPORT (4Q2000) <br /> Primary Agency Harlin Knoll <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Avenue,Third )Floor <br /> Stockton, CA 95202 <br /> Facility No 9-4275 Address 2905 West Benjamin Holt Drive,Stockton,California <br /> CHEVRON Project Manager Robert Cochran <br /> Consulting Co/Contact Person SECOR International, Inc —Roger Hoffmore X _3� <br /> Consultant Project No 077 41991 034 <br /> Assembly Bill 681 Status Property Owner Chevron Products Company <br /> WORK PERFORMED THIS QUARTER- Fourth Quarter—2000: <br /> 1 Conducted quartet ly groundwater monitoring and sampling <br /> . 2 Prepared and submitted groundwater monitoring report <br /> 3 System operation and maintenance <br /> 4 Prepaied and submitted the Quarterly Remedial System Evaluation Report <br /> WORK PROPOSED FOR NEXT QUARTER: First Quarter - 2001 <br /> 1 Conduct quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit groundwater monitoring report <br /> 3 System operation and maintenance <br /> 4 Prepare and submit the Quarterly Remedial System Evaluation Report <br /> QUARTERLY RESULTS SUMMARY. <br /> Current Phase of Project Monitoring and Sampling <br /> Frequency of Groundwater Sampling Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP) Present On-Site No <br /> Current Remedtatton Techniques N/A <br /> Approximate Depth to Groundwater 9 to 12 feet <br /> Groundwater Gradient North to Northwest @ ll 0007 to 0 002 ft/ft <br /> 3017 Kilgore Road, Suite 100, Rancho Cordova, Cif 95670 916 861 0400 916 861 0430 Fax www secor com <br />
The URL can be used to link to this page
Your browser does not support the video tag.