My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000323
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0000323
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:31:31 PM
Creation date
2/6/2019 4:58:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000323
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2905 W Benjamin Holt Drive, Stockton, California August 12, 1994 <br /> . Chevron USA Products Company Page 1 <br /> 1.0 INTRODUCTION <br /> This report is submitted by Groundwater Technology, Inc to summarize the methods and results of <br /> additional soil and groundwater assessment conducted at Chevron service station #9-4275 located at <br /> 2905 W Benjamin Holt Drive in Stockton, California (Figures 1 and 2) The scope of work included <br /> drilling and sampling five soil borings, installation of a groundwater monitoring well in one of the borings, <br /> quarterly groundwater monitoring and sampling, and preparation of this report Quarterly groundwater <br /> monitoring and sampling of existing groundwater monitoring wells (MW-1 through MW-8) is documented <br /> in this report The scope of work was designed to collect data required to fulfill the reporting <br /> requirements of the San Joaquin County Public Health Services, Environmental Health Division <br /> (SJCPHS-EHD) <br /> The drilling and well installation work described in this report was completed at the site on June 20, <br /> 1994, in accordance with the scope of work outlined in Groundwater Technology's Work Plan for <br /> Additional Groundwater Assessment, dated May 27, 1994, which was accepted by the SJCPHS-EHD <br /> C GROUNI)�4ArElt <br /> 0017aear rpt ^^,Tl,-Cl INOIAGI <br />
The URL can be used to link to this page
Your browser does not support the video tag.