Laserfiche WebLink
r <br /> TABLE OF CONTENTS � <br /> 1 0 IN-RODUCTION 1 <br /> 20 BACKGROUND 1 <br /> 3 0 ADDITIONAL ASSESSMENT WORK 1 <br /> 31 SITE-SPECIFIC HEALTH AND SAFETY PLAN/BACKGROUND REVIEW/PERMITTING 1 <br /> 3 2 SOIL BORINGS/ SAMPLING 2 <br /> 3 3 WELL INSTALLATION/DEVELOPMENT 2 <br /> 3 4 GROUNDWATER MONITORING AND SAMPLING 3 <br /> 40 SITE CONDITIONS 3 <br /> 41 HYDROGEOLOGY 3 <br /> 4 2 RESULTS OF SOIL ANALYSES 4 <br /> 4 3 RESULTS OF GROUNDWATER MONITORING AND ANALYSES 4 <br /> 5 0 CONCLUSIONS 5 <br /> LIST OF FIGURES <br /> FIGURE 1 - SITE LOCATION MAP <br /> FIGURE 2 - POTENTIOMETRIC SURFACE MAP, MARCH 11, 1992 <br /> FIGURE 3 - POTENTIOMETRIC SURFACE MAP, MARCH 17, 1992 <br /> FIGURE 4 - DISSOLVED TPN-G CONCENTRATION MAP, MARCH 17, 1992 <br /> FIGURE 5 - DISSOLVED BENZENE CONCENTRATION MAP, MARCH 17, 1992 <br /> LIST OF TABLES <br /> TABLE 1 - HISTORICAL GROUNDWATER ANALYTICAL RESULTS AND MONITORING DATA <br /> TABLE 2 - RESULTS OF SOIL SAMPLE ANALYSES <br /> APPENDICES <br /> APPENDIX A - DRILLING LOGS AND WELL CONSTRUCTION SPECIFICATIONS <br /> APPENDIX B - GROUNDWATER SAMPLING FIELD MEASUREMENTS <br /> APPENDIX C - LABORATORY REPORTS AND CHAIN-OF-CUSTODY REPORTS <br /> GROUNDWATER <br /> 2241StiM1 RPT <br /> TECHNOLOGY INC <br />