My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000354
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0000354
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 10:09:11 AM
Creation date
2/7/2019 8:19:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000354
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} 4� <br /> • � i <br /> ,= J Chevron <br /> Chevron <br /> t , 13A1t: <br /> Chevron Products Company <br /> June 9, 1998 6001 Bollinger Canyon Road <br /> Budding L <br /> San Ramon CA 94583 <br /> PO Box 6004 <br /> San Ramon CA 94583 0904 <br /> Mr James Wong <br /> San Joaquin County Environmental Health Marketing Phone 510 842-9500 Sales West <br /> 42-9500 <br /> 304 E Weber Ave,Third Floor <br /> Stockton, CA 95202 <br /> Re Chevron Station# 9-4275 2905 West Benjamin Holt Drive, Stockton, CA <br /> Attached First Quarter Remedial Activity Summary Report(G&M,5126198) <br /> Dear Mr Wong <br /> Please find attached a report dated, May 26, 1998,which was prepared by Chevron's consultant,Arcadis <br /> Geraghty&Miller(G&M),to describe the remedial activities at the subject site during the first quarter of <br /> this year <br /> AD The cyclic injection of air into all nine sparging wells will continue throughout the second quarter Soil <br /> vapor extraction will resume when groundwater levels drop sufficiently to expose hydrocarbon-impacted <br /> soil The summary report detailing second quarter remedial activity will be submitted in a more timely <br /> manner <br /> If you have any questions or comments, i can be reached at(925)842-8695 <br /> Sincerely, l <br /> Brett L Hunter <br /> Environmental Engineer <br /> Site Assessment and Remediation <br /> Attachment <br /> cc Elizabeth Thayer,Central Valley RWQCB, Sacramento,CA <br /> Paul Supple, ARCO Products Co ,P O Box 6549,Moraga, CA 94570 <br /> Greg Barclay, Secor international, Inc,3050 Fite Circle, Ste 204, Sacramento,CA 95827 <br />
The URL can be used to link to this page
Your browser does not support the video tag.