My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000354
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0000354
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 10:09:11 AM
Creation date
2/7/2019 8:19:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000354
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 4 <br /> . ARCADIS GERAGHTY&MILLER <br /> 2) Conversion of the SVE system to a bioventing system.This could be <br /> accomplished by modifying the current system to inject ambient air at a low <br /> flow rate into the SVE wells after groundwater recedes to approximately 13 <br /> feet bgs Bioventing would enhance the rate of aerobic msitu biodegradation <br /> of residual petroleum hydrocarbons by oxygenating the vadose zone and <br /> capillary fringe Due to the low influent vapor concentrations, bioventing <br /> can be implemented at the site more cost-effectively from a mass removal <br /> standpoint than continuing SVE system operation <br /> Please do not hesitate to call if you have any questions <br /> Sincerely, <br /> ARCADIS Geraghty &Miller, Inc <br /> Aaron O'Brien, CHMM <br /> Staff Engineer/Project Manager <br /> I <br /> i <br /> J <br /> ye qTa'ble <br /> E c President <br /> ent 1 SVE System Operational Parameters <br /> e 2 Air Sparging System Operational Parameters <br /> i <br /> our ref Page <br /> 80000309 0004!1 stgtr98 3/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.