My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000359
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0000359
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 9:59:06 AM
Creation date
2/7/2019 8:37:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000359
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f y, <br /> M <br /> S <br /> Chown <br /> Chevron <br /> i <br /> Chevron Products Company <br /> 6001 Bollinger Canyon Road <br /> September 30, 1997 Bwldmg L <br /> San Ramon CA 94583 <br /> P 0 Box 6004 <br /> San Ramon GA 94583-0904 <br /> Ms Mary Meays Marketing—Sales West <br /> San Joaquin County Public Health Services Phone 510 842-9500 <br /> 304 E Weber Ave Third Floor <br /> Stockton, CA 95202 <br /> Re Chevron Station # 9-4275 2905 West Benjamin Holt Drive Stockton CA <br /> Attached Product Piping and Excavated Soil Disposal Documentation <br /> Dear Ms Meays <br /> Please find attached several Non-Hazardous Special Waste&Asbestos Manifests from BF1 Vasco Road <br /> Landfill that document the proper disposal of 569 tons of soil that were generated during piping <br /> replacement activities at the subject site during November 1996 You will also find attached, a copy of the <br /> • bill of lading that was provided by Erickson, Inc that documents the proper disposal of the product piping <br /> that was replaced during November 1996 Both sets of documents are being provided in response to the <br /> request made in your letter dated June 17, 1997 <br /> 1 would also like to acknowledge your letter dated June 25, 1997 All issues in that letter pertaining to <br /> Blaine Tech's second quarter monitonng report (6/13/97) have been discussed with Blaine Tech The <br /> necessary corrections have been made and will be included in subsequent reports The third quarter <br /> sampling event was perforined on September 29 1997 according to the established schedule for the <br /> subject site Accordingly the report of third quarter monitoring will be submitted by the end of October <br /> The continents in your letter dated September 12 1997 concerning Geraghty& Miller's Draft Addendum <br /> to Corrective Action Plan (8115197)are appreciated The final addendum will incorporate those items <br /> discussed in your letter and will be submitted to your agency on or before October 10 1997 <br /> If you have any questions or comments, I can be reached at(510) 842-8695 <br /> Sincerely f <br /> Brett L Hunter <br /> Environmental Engineer <br /> Site Assessment and Remediation <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.