Laserfiche WebLink
4 E I h \ U t 0 L U U It Kta3 KUtZ, <br /> MONITOR WELL MW-2 <br /> PID GRAPHIC DESCRIPTION <br /> WPM) LOG <br /> 0 0 <br /> Chnsty box Clayey SILT(ML)brown,medium soli dry <br /> &lodung cap 5-100%day 5-101%fine sand,low est K no <br /> odor <br /> f Grout <br /> 2 2 <br /> 4"sch 40 <br /> PVC casing <br /> L�tl <br /> U.1 <br /> 4 4 <br /> w Sandy SILT(ML)right brown medium stiff, <br /> Qdry,15-25%fine sand low to moderate est <br /> LL K,no odor <br /> [r <br /> ❑ V <br /> Z 6 6 <br /> O <br /> m <br /> C7 <br /> O <br /> W <br /> m <br /> = 8 8 <br /> f-- <br /> ta_ <br /> w <br /> 10 10 <br /> S;r <br /> Increase in day tD 5-10%at 10' <br /> 0 <br /> 12 12 y <br /> l +l�F +l.+IiIF <br /> In.Radws 0 2 4 6 <br /> Continues <br /> EXPLANATION <br /> S Water level during drilling(date) Lagged by Mike Edmonson <br /> SZ Water level(date) Supervisor Kathleen Isaacson <br /> Contact(dotted where approx.} Drilling Company P C Exploration <br /> Gradational(hachured),uncertain(dashed)contact Driller Joe Eades <br /> © <br /> Location of recovered dnve sample Drilling Method 11 Hollow stem auger <br /> Location of drive sample sealed for Dates Drilled 2127/89 <br /> chemical analysts Well Head Completion Christy box&locking cap <br /> Grab sample Type of Sampler 2'split barrel <br /> est K=Estimated permeability(hydraulic conductivity) TD Total depth=34 0 ft <br /> Boning Log and Well Completion Details MW-2 Chevron Facility # 94275 <br /> WGR Project No 1-10405 Stockton , CA <br />