My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000368
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0000368
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 9:47:59 AM
Creation date
2/7/2019 8:43:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000368
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�l <br /> Ms Lori Duncan <br /> October 10, 2003 <br /> Page 3 <br /> Groundwater Groundwater <br /> Well IDs Monitoring Sampling Frequency <br /> Frequency <br /> ARCO Service Station <br /> E-9, E-10, PR 1,and BHD 1 Quarterly Quarterly <br /> E-2, E-3, E-4, E-5,E-61 E-81 Quarterly Semiannually <br /> E-11,E-12, MW-1 <br /> E-7,PR-2, BHD-2, MW-2, Quarterly Annually <br /> MW-3,MW-4,MW-5 <br /> Chevron Service Station <br /> MW-1 through MW-9, City of Quarterly Quarterly <br /> Stockton Well#10 <br /> Wells E-9, E-10, and BHD-1 will remain on a quarterly sampling schedule, based on their locations, <br /> which are downgradient from the underground storage tanks (USTs) and upgradlent of the nearby <br /> Chevron Service Station, and the presence of residual concentrations of petroleum hydrocarbons and <br /> MtBE in the wells Despite historically non-detectable concentrations of petroleum hydrocarbons and <br /> • MtBE, well PR-1 will remain on a quarterly sampling schedule, due to Its close, upgradlent proximity <br /> to City of Stockton Municipal Well #10 <br /> As requested in the SJCEHD September 11, 2003 letter, SECOR submitted an encroachment permit <br /> application package to the City of Stockton Public Works Department (CSPWD) on September 17, <br /> 2003 for uncovering ARCO well E-8 and raising the well box to grade Fallowing approval of the <br /> permit and completion of well repair activities, a groundwater sample will be collected from the well <br /> during the fourth quarter 2003 groundwater monitoring and sampling event <br /> Following review and approval by the SJCEHD, SECOR will implement the proposed modifications to <br /> the groundwater sampling program at the ARCO Service Station during the fourth quarter 2003 <br /> If you have any questions, please call us at (916) 861-0400 with any questions regarding this <br /> submittal <br /> Sincerely, <br /> SECOR International, Incorporated <br /> 1��Vll 4V k'bA k� <br /> Kasten Fiesoras ��SQR�F�E q�Fy <br /> Project Scientist ��, N <br /> cu <br /> QC NO C 058399 <br /> i <br /> us Benkosk P E * EXP - <br /> Senior Engine JTq CML <br /> a <br /> j <br /> I WRC0121331Misc LetterslSHCEHD RspLtr&M&S Redx Req doc ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.