My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000370
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0000370
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 9:41:53 AM
Creation date
2/7/2019 8:46:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000370
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ tNTE f?NATIONAi <br /> E C 0 R I vL 0l,P01,A'E D 3017 Kilgore Road Suite 100 <br /> Rancho Cordova GA 95670 <br /> 916 861 0400 TEL <br /> 916 861 0430 FAx <br /> January 22, 2004 <br /> R01 E C E�W E----"D <br /> Mr Robert J Cochran JAN 2 3 2004 <br /> Chevron Environmental Management Company <br /> 6001 Bollinger Canyon Road ENVIRONMENT HEALTH <br /> P O Box 6004 PERMIT/SERVICES <br /> San Ramon, California 95843 <br /> RE Fourth Quarter 2003 Remediation Systems Status Report <br /> Chevron Service Station 9-4275 <br /> 2905 West Benjamin Holt Drive <br /> Stockton, California <br /> SECOR Project No 77CH 94275 05 0570 <br /> Dear Mr Cochran <br /> SECOR International Incorporated (SECOR) presents with this letter 1) operational data for the soil <br /> vapor extraction (SVE) and air sparge (AS) systems which are being utilized to remediate soil and <br /> groundwater beneath the subject site and 2) an evaluation of the remediation systems effectiveness <br /> during the fourth quarter of 2003 (4003) The site location map and site plan are shown as Figure 1 <br /> ® and Figure 2, respectively <br /> Operation of the SVE and AS systems was initiated at the site in April 1997 The SVE system has <br /> been disabled and the AS continues to operate A brief description and performance evaluation of <br /> the remedial system between September 17, 2003 and December 02, 2003 are presented below <br /> SOIL VAPOR EXTRACTION SYSTEM <br /> The inactive SVE system is comprised of ten SVE wells (VW-1 and GM-1 through GM-9), <br /> underground mechanical piping, a 5-horsepower (hp) positive displacement blower, and 100-cubic <br /> feet per minute (cfm) catalytic oxidizer (Figure 2) <br /> During 4003, the SVE system did not operate due to high groundwater levels The SVE system has <br /> not operated since February 1998 On December 18, 2003, depth to water in the monitoring wells at <br /> the site ranged from 1014 to 12 65 feet below ground surface (bgs) The screened intervals in the <br /> SVE wells range from 10 to 17 feet bgs, therefore water levels are currently too high for effective <br /> operation of the SVE system <br /> AIR SPARGING SYSTEM <br /> The AS system is comprised of nine AS wells (GM-1 and GM-9), underground mechanical piping, <br /> and a 1 5-hp rotary vane air compressor During 4Q03, the AS system was operational for 99% of <br /> the reporting period at an average flow rate of 14 2 standard cubic feet per minute (scfm) and an <br /> average injection pressure of 5 3 pounds per square inch gauge (psig) Routine operation and <br /> maintenance visits were conducted on October 9, November 14, and December 2, 2003 <br /> 1 1Chevron1942751Penodsc Monitoring12003 O&M14003 O&M Report 9 4275 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.