My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000372
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0000372
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 9:51:36 AM
Creation date
2/7/2019 8:48:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000372
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AS SYSTEM FIL <br /> FIELD MONITORING DATA SHEETS <br /> IsDate p -b 3 Arrival Time <br /> Technician C I.,I�T _ Departure Time <br /> PART A. GENERAL INFORMATION <br /> Site Location Chevron 9-4275, 2905 W Benjamin Holt Drive Serial # <br /> Stockton California Max Amp Rating <br /> Sparge Blower 1 5 HP rotary vane air compressor Max Amp Rating <br /> Electrical Power 220V Elec Meter Reading <br /> # K/O Barrels at Site Full 0 Empty <br /> PART B: SPARGE SYSTEM DATA <br /> System up/down upon arrival? VP (if down, please complete Part C) <br /> Hour meter Reading <br /> At time `—>�0© <br /> A Previous hourmeter reading 38236 8(precious) 0 12 15 03/07/03 <br /> 000001 <br /> B Current hourmeter reading x @ Time/Date <br /> C Current reading minus previous reading <br /> D Total hours since last O&M event <br /> E C/D X 100 %Operability <br /> Report percent operability to site engineer prior to leaving site <br /> Flow Data Before Adjustment Final Ideal Ran e <br /> Total blower flow(cfm} a a <br /> Pipe Size 2" <br /> -T-Vo we 115 <br /> Pressure at blower/compressor(psi) 3 [7 <br /> Gauge Range 0-30 <br /> PART C TROUBLESHOOTING (complete if system was down upon arrival at site) <br /> Give details of system status upon arrival <Y-54er 1 r V AA I'M <br /> Give details of work performed to troubleshoot the problem On,L <br />
The URL can be used to link to this page
Your browser does not support the video tag.