My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000380
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0000380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 9:46:03 AM
Creation date
2/7/2019 8:52:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000380
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date April 26,2002 <br /> Quarter IQ02 <br /> CHEVRON QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 94275 Address 2905 West Benjamin Holt Drive,Stockton,California (Figure 1) <br /> CHEVRON Project Manager Robert(Bob)Cochran <br /> Consulting Co/Contact Person SECOR International Incorporated/Scott Gable <br /> Consultant Project No 77CH 43538 00 0670 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health Division <br /> Attention Lori Duncan <br /> Assembly Bill 681 Status Property owned by Chevron Products Company <br /> WORK PERFORMED THIS QUARTER (First Quarter—2002): <br /> 1 Conducted quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> 3 Performed system operation and maintenance <br /> WORK PROPOSED FOR NEXT QUARTER (Second Quarter—2002): <br /> 1 Conduct quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit Quarterly Groundwater Monitoring Report <br /> 3 System operation and maintenance <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project Assessment <br /> Frequency of Groundwater Sampling Quarterly_ <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP)Present Onsite No <br /> FP Recovered this Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Current Remediation Techniques AirSpar&ng <br /> Approximate Depth to Shallow Groundwater 7 6 to 9 86 feet <br /> Groundwater Gradient North @ 0 004 ft/ft,northwest @ 0 002 ft/ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.