Laserfiche WebLink
SOIL VAPOR EXTRACTION SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> Date Time of Arrival —7 30 <br /> Technician 7� Time of Departure It `d <br /> Site Engineer_. _RusttiE, Benkosky Was Site Engineer or substitute coutacted from field? <br /> Yes No <br /> PART A GENERAL INFORMATION <br /> Site Location 22908.BegLamllzHolt Drive.Stockton,CA Station No,--ARCO#2133 Project No 778P•43235.00 019.0 <br /> Abatement Equip., KatoxJ Goofm catalAic oxidizerSerial No <br /> SVE Blower Turbotron. 10 H P. Max AMP Rating 40 <br /> SPG Blower Tuthill,5 H.P. MAX AMP Rating 202 <br /> Telemetry <br /> Electrical Power 230V Slnafe Phase_. <br /> Elect Meter Reading �•� /_� <br /> Supplemental Fuel All electric to <br /> No of K/O barrels at site Full Empty <br /> PART B SVE SYSTEM DATA <br /> System up or down upon arrival _ Gig ��" (If down please complete PART E) <br /> Hourmeter Reading At time <br /> i) <br /> Flow Data Before Ad ustment Final !deal Ran a <br /> %Dilution air valve oven <br /> %Recirculation valve open <br /> WO Content al <br /> Vacuum ® blower(In H2O) <br /> Gau a Range 0-200 <br /> AMPS drawn b blower motor AMPS <br /> Total System Flow(A P.In H2O) <br /> Pipe Size 6 3" <br /> Well Field Air Flow(A P,in H2O) <br /> Pipe Size 4 T <br /> Dilution Air Flow(A P."H2O) <br /> Pipe Size 0 " <br /> if) <br /> FID Data Without Carbon With Carbon Difference <br /> System Influent my before dilution <br /> System Influent my after dilution <br /> System Effluent my <br /> Field Instrument Used Last Calibrated <br />