My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000402
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0000402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 9:51:39 AM
Creation date
2/7/2019 9:07:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000402
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S Ec0R <br /> Commingled Plume No. 0034 <br /> 2905 and 2908 Benjamin Holt Drive, Stockton <br /> October 27, 2005 <br /> • Page 2 <br /> borings on the Chevron site to monitoring wells to replace wells destroyed for a site <br /> demolition. The costs to advance these borings for commingled plume delineation have <br /> been included; however, the costs to convert those borings to monitoring wells <br /> (reinstalling the destroyed wells) on the Chevron property have not been included, and will <br /> be covered separately by Chevron. <br /> Schedule <br /> SECOR can proceed with the proposed scope of work immediately, pending receipt of <br /> cost pre-approval. <br /> Budget <br /> The project budget to complete the indicated work steps is summarized in Attachment 3. <br /> The proposed scope of work is based on billing rates approved by the State Water <br /> Resources Control Board Underground Storage Tank Cleanup Fund Program. A pre- <br /> approval request form is included in Attachment 4. <br /> If there are any questions, please call us at (916) 861-0400. <br /> Sincerely, <br /> SECOR International, Incorporated <br /> Brian Carey <br /> Associate Geologist <br /> Attachments: Attachment 1 — RWQCB Letters Dated March 7, 2005, and August 1, 2005 <br /> Attachment 2— Work Plan for Soil and Groundwater Delineation and <br /> Addendum to Work Plan for Well Destruction and UST Removal, <br /> dated May 27, 2005 <br /> Attachment 3— Budget For Additional Site Assessment <br /> Attachment 4— Pre-approval Request Form <br /> I <br /> cc: Mr. Darin Rouse, Chevron Environmental Management Company <br /> Mr. Paul Supple, Atlantic Richfield Company, Moraga, California <br /> Mr. James Barton, California Regional Water Quality Control Board— Central <br /> Valley Region, Sacramento, California <br /> Mr. Eric Holm, Delta Environmental Consultants, Inc., Rancho Cordova, California <br /> Ms. Lori Duncan, San Joaquin County Environmental Health Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.