My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1523
>
2900 - Site Mitigation Program
>
PR0527250
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 11:31:42 AM
Creation date
2/7/2019 10:02:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527250
PE
2950
FACILITY_ID
FA0018453
FACILITY_NAME
BIER PROPERTY
STREET_NUMBER
1523
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15304011-14-15
CURRENT_STATUS
01
SITE_LOCATION
1523 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 July 2007 <br /> AGE-NC Project No. 06-1481 <br /> Page 3 of 7 <br /> 5.0. PERSONAL PROTECTIVE EQUIPMENT <br /> Based on evaluation of potential hazards, the following levels of personal protection have been <br /> designated for the applicable work areas or task: <br /> LOCATION: JOB FUNCTION: LEVELS OF PROTECTION: <br /> Exclusion Zone Advance borings/collect A B C D Other <br /> samples <br /> Reduction Zone Preserve samples A B C D Other <br /> and log borings <br /> Support Zone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> hard hat <br /> steel-toed boots <br /> Level D: half-faced respirator(if necessary) <br /> gloves <br /> safety glasses <br /> If airpurifying respirators are authorized,organic vapor and dust is the appropriate canister foruse <br /> with the involved substances and concentrations.No down-grading changes of the specified levels <br /> of protection shall be made without the approval of the site safety officer and the project team leader. <br /> Advanced GcA.n ironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.