My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:29:29 PM
Creation date
2/7/2019 10:28:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 4, grown and Caldw <br /> Consultants <br /> 723 S Street <br /> Sacramento <br /> California 95814-7092 <br /> (916)444-0123 <br /> FAX(916)444-8437 <br /> July 30, 1991 <br /> Mr. Chuck Carmel <br /> ARCO Products Company <br /> 2000 Alameda de las Pulgas <br /> Post Office Box 5811 Z, <br /> San Mateo, California 94403 1 - /1 <br /> Subject: Sampling Schedule for Groundwater Extraction System, ARCO Station 2133, <br /> Stockton, California <br /> Dear Mr. Carmel: <br /> The following is the groundwater discharge sampling schedule through the end of 1991 for <br /> ARCO Products Company Station 2133, located at 2908 Benjamin Holt Drive, Stockton, <br /> California. The sampling will generally be done in the morning between 9:00 am and 11:00 am. <br /> The laboratory results are available approximately 2 weeks after the samples are submitted for <br /> analysis. <br /> Groundwater Discharge Sampling Schedule <br /> Samples analyzed for Samples analyzed for <br /> Date TPH and B= trace metals <br /> 7/24 X X <br /> 8/7 X <br /> 8/21 X X <br /> 9/11 X <br /> 9/25 X X <br /> 10/9 X <br /> 10/23 X X <br /> 11/6 X <br /> 11/20 X X <br /> 12/4 X <br /> 12/18 X X <br />
The URL can be used to link to this page
Your browser does not support the video tag.