My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:29:29 PM
Creation date
2/7/2019 10:28:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t - <br /> i <br /> From: Westhoff, Brian <br /> Sent: Wednesday, March 19, 2014 11:19 AM <br /> To: 'Adrienne Ellsaesser [EH]'; John Yoakum [EH]. <br /> Cc: Morescalchi, Sergio; MacLeod, Carryl G; Schreiner, Dan <br /> Subject: RE: Arco 2133/Chevron 94275 Stockton CA Well Decommissioning Request <br /> Yes,see attached bore logs. <br /> MW-1 R screen is 5-20' bgs. <br /> V-1 screen is 4-24' bgs. <br /> V-12 screen is 6-21' bgs. <br /> Brian Westhoff, PG(CA, ID, OR, UT, & WA) <br /> Senior Geologist <br /> Stantec <br /> Phone: (916) 384-0710 <br /> Cell: (916) 494-2824 <br /> Fax: (916) 861-0430 <br /> Brian.Westhoff@stantec.com <br /> X - <br /> The content of this email is the confidential property of Stantec and should not be copied,modified,retransmitted,or used for any purpose except with <br /> Stantec's written authorization.If you are not the intended recipient,please delete all copies and notify us immediately. <br /> Please consider the environment before printing this email. <br /> From: Adrienne Ellsaesser [EH] [mailto:AEllsaesser(absjcehd.com] <br /> Sent: Wednesday, March 19, 2014 10:59 AM <br /> To: Westhoff, Brian; John Yoakum [EH] <br /> Cc: Morescalchi, Sergio; MacLeod, Carryl G; Schreiner, Dan <br /> Subject: RE: Arco 2133/Chevron 94275 Stockton CA Well Decommissioning Request <br /> What are these wells depths? Can you pull them out???? <br /> From: Westhoff, Brian (mailto:Brian.WesthoffC�stantec.com] <br /> Sent: Wednesday, March 19, 2014 10:02 AM <br /> To: Adrienne Ellsaesser [EH]; John Yoakum [EH] <br /> Cc: Morescalchi, Sergio; MacLeod, Carryl G; Schreiner, Dan <br /> Subject: Arco 2133/Chevron 94275 Stockton CA Well Decommissioning Request <br /> Hi Adrienne, <br /> We spoke to John Yoakum in the field yesterday and he suggested we reach out to you on our request below <br /> for the following wells. <br /> We have attached three field notification of wells were we are finding new utility lines (V-1 and MW-1 R) or an <br /> old'one that field team is requesting a second look (V-12).The wells in question are V-1 and V-12 on the Arca <br /> property (first and third email attachments) and MW-1 R on the Chevron property (second email attachment). <br /> These three wells are scheduled for overdrilling based on our discussions previously. <br /> For Well V-1, an electrical line is located four (4) inches off of the well vault and is located 2.5 feet below grade. <br />` This electrical line was not known in previous utility locates and was identified in the last month's utility locate. <br /> Given the close proximity to the electrical line, spinning augers have the potential to come into contact and <br /> most likely wrap around the augers.This would be beyond performing lock out tag out to prevent exposure.We <br /> would like to add this well (V-1) to list of variance wells to only do a mushroom cap over the well hole diameter <br /> of 10" to 2 feet below ground surface to avoid coming into contact with the line. <br /> 2 <br /> _ � i <br />
The URL can be used to link to this page
Your browser does not support the video tag.