Laserfiche WebLink
Page 3 of 11 <br /> French [EH]'; Egger, Brian <br /> Subject: RE: 2905 &2908 Benjamin Holt Drive, Stockton, CA - Request for well destruction Variances <br /> I am resending the variance package as I have added a utility site plan to th a package. <br /> Thanks, <br /> Shane Olton, PG <br /> Senior Geologist <br /> Stantec <br /> 3017 Kilgore Road Suite 100 <br /> Rancho Cordova CA 95670 <br /> Ph: (916)384-0758 <br /> Fx: (916)861-0430 <br /> Cell: (530)908-4404 <br /> Shane.Olton(a)stantec.com <br /> stantec.com <br /> The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for <br /> any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and <br /> notify us immediately. <br /> Please consider the environment before printing this email. <br /> From: Olton, Shane <br /> Sent: Monday, August 19, 2013 9:25 AM <br /> To: 'Lisa Medina [EH]' <br /> Cc: Adrienne Ellsaesser [EH]; Nuel Henderson [EH]; Schreiner, Dan; Sergio.Morescalch0ft.com; Sherri French <br /> [EH]; Egger, Brian <br /> Subject: RE: 2905 &2908 Benjamin Holt Drive, Stockton, CA - Request for well destruction Variances <br /> Hi Lisa, <br /> The agenda for the meeting will be to discuss the well destruction variance requests for the previously sent to <br /> you. The following is a table summarizing each variance. The attached document contains additional detail for <br /> each specific well on the spreadsheet. <br /> Well I D Approved Well Variance Utility Conflicts <br /> Destruction Method Requested <br /> Chevron Wells <br /> MW-6(C) Over-drill Pressure Grout Overhead(Tree);'/."non-metallic utility intersecting well column(depth undetermined) <br /> MW-1 R(C) Over-drill Pressure Grout 6'from tank pit <br /> ARCO Wells <br /> E-2(A) Over-drill Pressure Grout Overhead utility 10' south (15' high) and 9' northeast (15' high); Sanitary sewer 9" <br /> northeast of well column 10"dee <br /> E-4(A) Over-drill Pressure Grout Subsurface electrical line to station lighting 6"east of well column(1'deep) <br /> E-6(A) Over-drill Pressure Grout Directly adjacent to above-ground vapor tank bollard/compound; vent lines directly <br /> adjacent <br /> E-9(A) Over-drill Pressure Grout Irrigation line 1'6"east of well column (depth undetermined); Subsurface electrical 2'6" <br /> south of well column(depth undetermined);ARCO station sign 6"west of well <br /> MW-3(A) Over-drill Pressure Grout Offsite;Unknown utility 2'east of well column(depth undetermined) <br /> V-5(A) Over-drill Pressure Grout Overhead utility(unknown voltage)9'south <br /> V-6(A) Over-drill Pressure Grout Overhead (station awning); Sanitary sewer 1'4" northeast of well column (6" deep); <br /> Product lines 3'south of well column(depth undetermined <br /> V-7(A) Over-drill Pressure Grout Overhead utility(unknown voltage)7'southwest(15'high) <br /> V-8(A) Over-drill Pressure Grout Sanitary sewer 1'6"northeast of well column(7"deep);tank pit 2'south of well <br /> V-9(A)/ Over-drill Pressure Grout Overhead utility(unknown voltage)8'southwest @ 15' <br /> S-7(A) <br /> V-12(A) Over-drill Pressure Grout Subsurface electrical line to station lighting IV'east of well column(1'deep) <br /> S-2(A) Over-drill Pressure Grout Underground electrical line 6"north of well column(1'9"deep) <br /> S-4(A) Over-drill Pressure Grout Sanitary sewer 1'9"northeast of well column(6"deep);adjacent multiple tank pits(8') <br /> 1/29/2014 <br />