My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:29:29 PM
Creation date
2/7/2019 10:28:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Margaret Lagorio -2-. <br /> 252999.93(a)(3) At least 85%of the plume is comprised of petroleum <br /> contamination resulting from an unauthorized release from <br /> a tank whose owner or operator is eligible or payment of a <br /> claim pursuant to Section 25299.54. <br /> 25299.93(x)(4) At least two-contributing,sites involve an unauthorized <br /> release. <br /> 25299.93(a)(5) The joint claimants have coordinated corrective action as <br /> soon as practicable. <br /> 25299.93(a)(6) -The joint claimants agree to seek preapproval of corrective <br /> action costs in accordance with subdivision(c)of Section <br /> 25299.57.. <br /> 25299.93(a)(7) The joint claimants must have entered into a written <br /> agreement that provides for a coordinated corrective plan. <br /> Several reviews will be conducted for the claim application including an administrative, <br /> technical and settlement review. Once all reviews are complete, you will be notified by letter of <br /> the claim's acceptance or rejection. A regulatory review of the subject files will be requested if <br /> all eligibility requirements have been met to.verify corrective action history and compliance. In <br /> the event information in the regulatory review is obtained that disqualifies acceptance of the <br /> CPA claim, you will be notified by letter. <br /> NOTE: Article 11 requires joint claimants to the CPA Program to coordinate their corrective <br /> work as soon as possible and obtain preapproval of all corrective action costs once the claim <br /> receives a Letter of Commitment. The Fund will expect that joint directives are issued to the <br /> joint claimants to ensure coordinated corrective action. <br /> If there are any questions,please telephone me at (916) 341-5760. <br /> Sincerely, = <br /> Judy Reid <br /> CPA Administrator <br /> UST Cleanup Fund <br /> Ce foraia Ea viroamenta/Protecdo.7Ageacy <br /> a <br /> P.a Recyc%dFkper <br />
The URL can be used to link to this page
Your browser does not support the video tag.