My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:29:29 PM
Creation date
2/7/2019 10:28:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
page 2, 2905-2908 Benjamin Holt Drive <br /> I <br /> SJC/EHD approves the installation of offsite shallow monitoring well MW-10. SJC/EHD <br /> approves the installation of boring AS-11 to delineate the extent of the 1, 2-dichloroethane <br /> plume. ARCO owned monitoring wells E-8 and E-7 are located in the middle of Plymouth <br /> Drive. These wells are frequently not sampled due to safety issues posed by traffic on j <br /> this street. If ARCO prefers not to sample these wells they must submit.a work plan to <br /> have them properly destroyed; these wells could be replaced by one shallow well located <br /> on the east side of Plymouth Dr., near proposed boring AS-11. <br /> The `addendum' portion of this work plan refers to a previously submitted and approved <br /> work plan dated February 18, 2005 submitted by SECOR on behalf of Chevron #9-4275. <br /> All onsite monitoring and remediation wells that belonged to Chevron #9-4275 were <br /> destroyed in May 2005 pending reconstruction of the station. SECOR is proposing in this <br /> addendum to change the construction of the monitoring wells when they are re-installed <br /> from total depth of 30 feet bsg to total depth of 20 feet bsg, with 15 feet of screen interval. <br /> This change is proposed because current depth to groundwater at the site is <br /> approximately 10 feet bsg. SJC/EHD approves this change in the construction of the <br /> replacement monitoring wells. <br /> Please proceed with submittal of a San Joaquin County Well Permit Application and <br /> required $89.00 permit fee for each parcel of land on which drilling will take place. Offsite <br /> borings will also require access agreements and/or City of Stockton revocable and <br /> encroachment permits, copies of which must be submitted to SJC/EHD before drilling <br /> permits can be issued. Implementation of all proposed and approved work must begin no <br /> later than October 3, 2005, and a report of findings must be submitted to SJC/EHD within <br /> 60 days following completion of all fieldwork, and must be presented within the context of <br /> a site conceptual model. <br /> If you have any questions please call Lori Duncan at (209) 468-0337. <br /> i <br /> Donna Heran, RENS, Director <br /> Environmental Health Department <br /> lel �-• lelz <br /> � <br /> Lori Duncan, Senior REHS Nuel C. Henderson; Jr., PG <br /> LOP/Site Mitigation Unit IV LOP/Site Mitigation Unit IV <br /> i <br /> i <br /> cc: James Barton, CVRWQCB <br /> Diane.Barclay, SECOR <br /> i <br /> t <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.