My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:29:29 PM
Creation date
2/7/2019 10:28:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H <br /> B R 0 W N AND l;t, �r11 : r rEA <br /> 9d 11 i; 1 i; �!1 d _H <br /> r <br /> SEt. 311 i <br /> CALDWELL ') ! i4 ' 1: 30 <br /> July 7, 1994 <br /> Ms. Laurie Cotulla <br /> Public Health Services <br /> San Joaquin County <br /> Post Office Box 2009 <br /> Stockton, California 95201 017-1273-01/1 <br /> Subject: Soil„Vapor Extraction/Air Sparge (SVE/AS) System Installation Schedule, <br /> ARCO Station 2133, Site Code 1020 <br /> Dear Ms. Cotulla: <br /> This letter is in response to a March 24,. 1994,;letter from the San Joaquin County Public <br /> Health Services, Environmental Health Division (County). Contained in the March 24 <br /> letter was a request for a lithologic cross section, documentation for disposal of the well <br /> development water and drill cuttings, evidence'that permission to drill a soil borehole off <br /> site to the south is being pursued, and construction and start-up of the SVE/AS system be <br /> completed by July 20, 1994. <br /> Figure 1 presents a site map showing the surface representation of lithologic cross section <br /> A-A'. Figure 2 is lithologic cross section A-A'. Attachment A of this letter is <br /> documentation from Dillard Trucking for the disposal of the soil generated during the <br /> installation of;;the soil vapor extraction, air sparging, and groundwater monitoring wells <br /> described in Brown and Caldwell's (BC's) March 10, 1994, report. On March 23, 1994, <br /> via FAX, BC submitted to Ms. Mary Meays of your staff, documentation that efforts to <br /> gain access to off-site drilling locations were being pursued unsuccessfully. <br /> On behalf of ARCO, BC is requesting an extension of the July 20, 1994, date for <br /> completion of the construction and start-up,of the SVE/AS system to the week of <br /> September 26 1994. The following is an anticipated schedule of events associated with <br /> the construction and start-up of the system. <br /> May 4, 1994 Submittal of,'revised (from a 100-cubic-feet-per-minute <br /> (cfm) unit to a 250-cfm unit) Authority to Construct <br /> Permit to the San Joaquin Valley Unified Air Pollution <br /> Control District (SJVAPCD). This task is completed. <br /> ARCO received a letter dated May 13, 1994, from <br /> SJVAPCD deeming the application complete. <br /> According to; SJVAPCD regulations, the revised permit <br /> will be issued within 90 days of the May 13 letter. <br /> 07/07/94,E:112 73,CDRRESP,1273.0 I.L.I - <br /> QMS-PS2200 <br /> Environmental Engineering And Consulting•Analytical Services <br /> 9616 MICRON AVENUE,.P. 0. Box 13449, SACRAMENTO, CA 95813-3449 <br /> (916) 444-0123 FAX (916) 856-5277 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.