Laserfiche WebLink
ARCO Products Company 3 <br /> ARCO Station J12133.2908 Benjamin Holt Drive,Stockton.CA Febmary 18, 1999 <br /> lead by EPA Methods 8015, 8020, and 6010, respectively.. If soil is found to be <br /> contaminated with petroleum hydrocarbons, the soil. will be disposed of at an approved <br /> landfill. <br /> Reporting and Schedule <br /> SECOR anticipates initiating field activities during the week of March 1, 1999. After <br /> completion of the-field work and laboratory analyses, the data will be evaluated and <br /> assembled into a report. Included in the.report will be soil analytical results, chain-of- <br /> custody documentation, a summary of field observations, assessment, and conclusions. <br /> This report will be submitted to the SJCEHD within 6 to 8 weeks of receiving all <br /> analytical sample results from the laboratory. <br /> If there are any questions regarding the contents of this work plan, please call us at (916) <br /> 364-1880. X22�1 <br /> Sincerely, <br /> SECOR International corporated <br /> �OQ�OFESS/pN� <br /> Rusty . enkosky, P. ExPlImI-o Z <br /> Project Engineer *�'� CIVIL �* <br /> 9 OF CAL�F�P� <br /> Greg arclay, G 6260 <br /> Senior Geologist <br /> Attachments: Figure 1 - Site Map <br /> Attachment A - Field and Laboratory Procedures <br /> Attachment B - Site Health and Safety Plan <br /> cc: Mr. Paul Supple, ARCO Products Company <br /> Mr. Mark List, RWQCB - Central Valley Region <br /> 7G600-019-04JWPLAN <br />