My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:07:10 PM
Creation date
2/7/2019 10:31:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> Well Construction and Proposed Well Destruction Details <br /> Chevron Facility#94275 and ARCO Service Station No.2133 <br /> 2905 and 2908 West Benjamin Holt Drive,Stockton,CA <br /> Boring Borehole Casing V Cement <br /> Well I.D. S <br /> Construction Elevation Depth Diameter Diameter Casing Material Slot Size Screened Interval Filter Pack Interval Bentonite Seal Interval Interval(feet <br /> Proposed Well Destruction <br /> Date (TOC feet) (feet bgs) (inches) - (inches) (inches) (feet bgs) (feeYbgs) (feet bgs) bgs) Method <br /> Remediation Wells(R,V,S) <br /> R-1 7/24/84 - 42 12 PVC - 9-35 8-40 - - Over-dell <br /> V-1 10/13/93 1.94 24 10 4 PVC 0.030 4-24 3-24 273 0-2 Over-drill <br /> V-2 10/12/93 1.47 25 10 4 PVC 0.030 4-24 3-25 2-3 0-2 Over-drill <br /> V-3 10/12/93 1.56 25 10 4 PVC Ot030 4-24 3-25 2-3 0-2 Over-drill <br /> V-4 10/14/93 2.24 25 10 4 PVC 0.030 4-24 3-24 273 0-2 Over-drill <br /> V-5 10/18/93 3.26 25 10 4 PVC 0.030 4.5-24.5 `3.25 2-3 0-2 Over-drill ti <br /> V-6 10/14/93 2.34 23 10 4 , PVC 0.030 . 3-23 2-23 1-2 0-1 Over-drill <br /> V-7 10/15/93 2.16 25 10 4 PVC 0.030 4-24 3-24 2-3 0-2Over-drill <br /> V-8 8/15/94 21.5 10 2 PVC '0.030 6-21 5-21 3-5 20-3 Over-drill' <br /> V-9/S-7 8/15/94 31.5 - 1 PVC 0.020 6-21/27.5-30 5-21/26.5-30 35/21-26.5 0-3 Over-drill <br /> V-10/S-8 8/16/94 31.5 - 2/1 PVC 0.020 6-21/27.5-30 5-21/26.5-30 3-5/21-26.5 0-3 Over-drill <br /> V-11 8/15/94 2.95 21.5. 10 2 PVC 0.030 .5-21 421 2-4 0.2 Over-drill <br /> V-12 8/16/94 1.21 21.5 - 2 PVC 6-21 5-21 -35 0-3 Over-drill <br /> S-1 10/12/93' 0.90 25 1 PVC Sch.40 0.020 22-24 19-25 14-19 0-14 Over-drill <br /> S-2 10/13/93 1.75 25 1 PVC Sch.40 0.020 2325 20-25 15-20. 0-15 Over-drill. <br /> S-3 10/15/93 2.30 25 1 PVC Sch.40, 0.020 2325 19-25 12-19 0-12 Over-drill <br /> S-4 10/15/93: 1.39 24.5 6 1 PVC'Sch.40 0.020 22-24 18.5-24 15.5-18.5 0.15.5 Over-drill <br /> S-5 10/18/93 2.58 24.5 6 1 PVC Sch.40 0.020 20-22 19-24 15-19 0-15 Over-drill <br /> S-6 10/19/93 • 4.25 -25 1 PVC Sch.40 r 0.020 2325• 20-25 16-20 0-16 Over-drill <br /> S-9 8/16/94 1.73 30 1 PVC Sch.40 0.020 27.5.3D 26.5-30 21-26.5 0-21 Over-drill <br /> Soil Borings <br /> AS-8 2/23/06 65 6 . . 0-61- <br /> AS-9 2/24/06 67.5 6 - 0-65 <br /> 8 AS-10 2/27/06 63 6 0-63 <br /> AS-1-1 3/2/06 25 6 - 0-25 <br /> Notes: <br /> bgs=below ground surface <br /> TOC=top of casing <br /> PVC=polyvinyl chloride - -- <br /> s Sch.=Schedule - • - - _ ._ .. - . <br /> Filter Pack is with#3 sand <br /> =Not Available/Not Applicable <br /> Elevations are in US survey feet <br /> Well Construction and Proposed Well Destruction details.xls Page 2 of 2 Stantec <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.