My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:07:10 PM
Creation date
2/7/2019 10:31:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;1 <br /> 2905 & 2908 Benjamin Holt Dr. <br /> Page 2_ <br /> be cut off 6 inches above the bottom of this excavation, and removed. The grout used to <br /> seal the well shall then be topped off and allowed to spill over into the excavation and fill <br /> it for a thickness of one foot to form a 'mushroom cap' over the top of the cut casing. <br /> m If 'nested' wells were installed at the site and need to be destroyed by overdrilling, an <br /> auger larger than the original auger must be used and centered on the deepest casing <br /> (which is off-center in the original borehole). The auger needs to be sized sufficiently to <br /> reach out and remove all well casings, screens, filter packs, and grout sealant installed <br /> during construction. <br /> ® All groundwater displaced to the surface during grout.installation shall be pumped out of <br /> the excavation and containerized for proper disposal. <br /> • Any wells located offsite require updated access agreements and/or encroachment <br /> permits to be submitted with the EHD Well Destruction Permit Application. <br /> Deadline for submittal of the.work plan is December 6, 2012. After the EHD has approved the <br /> work plan you may submit an EHD Well Destruction Permit Application along with the <br /> appropriate fees. Current fees are: $375:00 per permit, (one permit per parcel) plus $125.00 <br /> per each well on the parcel that is to be destroyed. A nested well is considered to be one well. <br /> If you have any questions please contact Lisa Medina at (209)468-3455 or by email at <br /> Imedina@sjcehd.com. <br /> Sincerely, <br /> Lisa edina, REHlEnvir <br /> Senior Registeredmental Health Specialist <br /> c: James Barton, PG, CVRWQCB, 11020 Sun Center Drive#200, Rancho Cordova, CA 95670 <br /> Brian Westhoff, Stantec, 3017 Kilgore Road Ste. 100, Rancho Cordova, CA 95670 <br /> I <br /> i <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.