Laserfiche WebLink
i <br /> Stantec <br /> No Further Action Request Deport <br /> Chevron and ARCO Commingled Plume No. CP0034 <br /> April 10, 2012 <br /> 6. REFERENCES <br /> Brown and Caldwell Consultants (B&C), 1987a. Problem Assessment Report, June 10, 1987. <br /> B&C, 1987b. Soil Sampling Results, October 5, 1987. <br /> B&C, 1992. Excavation of Product Recovery Tank and Installation of New Waste Oil Tank at <br /> ARCO Station 2133, Stockton, Site Code 1021, January 13, 1992. <br /> California Regional Water Quality Control Board - Central Valley Region, 2004, Appendix A — <br /> Reports, Tri-Regional Board Staff Recommendations For Preliminary Investigation and <br /> Evaluation of Underground Tank Sites, April 16, 2004. <br /> Chevron Products Company, 1997. Attached Product Piping Removal Soil Sampling Report <br /> (Touchstone, 12122/1996), May 19, 1997. <br /> Geraghty & Miller, Inc., 1997. Addendum to Corrective Action Plan, October 9, 1997. <br /> EMCON Associates, 1986. Remedial Action Evaluation for ARCO Service Station on Benjamin <br /> Holt Drive, Stockton, California, March, 20, 1986. <br /> SECOR International Incorporated (SECOR), 1998. Second Quarter 1998 Remedial System <br /> Evaluation Report, August 31, 1998. <br /> SECOR, 1999. Soil Sampling during UST and Product Line.Replacement Activities, July 7, <br /> 1999. <br /> SECOR, 2002. Soil Sampling during Waste-Oil UST Removal, September 10, 2002. <br /> SECOR, 2005. Second Quarter 2005 Quarterly Progress Report, August 15, 2005. <br /> SECOR, 2006`: Additional Site Assessment Report and Site Conceptual Model, September 1, <br /> 2006. <br /> SECOR, 2007. Quarterly Groundwater Monitoring and Remediation Progress Report Second <br /> Quarter 2007, August 13, 2007. <br /> SECOR, 2008. Quarterly Groundwater Monitoring Report First Quarter 2008, May 30, 2008. <br /> Stantec Consulting Corporation (Stantec), 2011. Quarterly Groundwater Monitoring Report <br /> Third Quarter 2011, October 26, 2011. <br /> 94275 NFAR 2012.doc 19 <br />