i
<br /> Stantec
<br /> No Further Action Request Deport
<br /> Chevron and ARCO Commingled Plume No. CP0034
<br /> April 10, 2012
<br /> 6. REFERENCES
<br /> Brown and Caldwell Consultants (B&C), 1987a. Problem Assessment Report, June 10, 1987.
<br /> B&C, 1987b. Soil Sampling Results, October 5, 1987.
<br /> B&C, 1992. Excavation of Product Recovery Tank and Installation of New Waste Oil Tank at
<br /> ARCO Station 2133, Stockton, Site Code 1021, January 13, 1992.
<br /> California Regional Water Quality Control Board - Central Valley Region, 2004, Appendix A —
<br /> Reports, Tri-Regional Board Staff Recommendations For Preliminary Investigation and
<br /> Evaluation of Underground Tank Sites, April 16, 2004.
<br /> Chevron Products Company, 1997. Attached Product Piping Removal Soil Sampling Report
<br /> (Touchstone, 12122/1996), May 19, 1997.
<br /> Geraghty & Miller, Inc., 1997. Addendum to Corrective Action Plan, October 9, 1997.
<br /> EMCON Associates, 1986. Remedial Action Evaluation for ARCO Service Station on Benjamin
<br /> Holt Drive, Stockton, California, March, 20, 1986.
<br /> SECOR International Incorporated (SECOR), 1998. Second Quarter 1998 Remedial System
<br /> Evaluation Report, August 31, 1998.
<br /> SECOR, 1999. Soil Sampling during UST and Product Line.Replacement Activities, July 7,
<br /> 1999.
<br /> SECOR, 2002. Soil Sampling during Waste-Oil UST Removal, September 10, 2002.
<br /> SECOR, 2005. Second Quarter 2005 Quarterly Progress Report, August 15, 2005.
<br /> SECOR, 2006`: Additional Site Assessment Report and Site Conceptual Model, September 1,
<br /> 2006.
<br /> SECOR, 2007. Quarterly Groundwater Monitoring and Remediation Progress Report Second
<br /> Quarter 2007, August 13, 2007.
<br /> SECOR, 2008. Quarterly Groundwater Monitoring Report First Quarter 2008, May 30, 2008.
<br /> Stantec Consulting Corporation (Stantec), 2011. Quarterly Groundwater Monitoring Report
<br /> Third Quarter 2011, October 26, 2011.
<br /> 94275 NFAR 2012.doc 19
<br />
|