My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012553
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0012553
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:10:23 PM
Creation date
2/7/2019 11:05:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012553
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
50 <br /> WE <br /> PQ <br /> REM <br /> 'i <br /> t <br /> •� r <br /> 9 BRAWN AND CALDWELL -- —--- <br /> CONSULTING ENGINEERS <br /> .f <br /> June 29, 1989 i <br /> JUL <br /> ENVIRONMENITALHEALTH4 i f <br /> PERMtr/SERVICES }i <br /> Mr. Kyle Christie t` <br /> ARCO Products Company <br /> ?000 Alameda de las Puigas <br /> Post Office Box 5811 017-3173-3011 <br /> San Mateo, California 94403 <br /> i <br /> Subject: Fourth Quarter Sampling Results, ARCO Station 2133, <br /> 29(18 Benjamin Holt Drive, Stockton, California <br /> Dear Mr. Christie: <br /> On February 27, 28, and March 2, 1989, Brown and Caldwell collected groundwater samples ' <br /> from 13 selected monitoring wells at the subject site. The samples represent the fourth <br /> quarterly sampling a gent for the site. <br /> k Quarterly Sampling <br /> PR-2, BHD-2, E-2, E-4, E-5, E-6, E-7, E-8, E-9, E-10, EA 1, <br /> Prior to sampling wells PR-1, was used to purge <br /> and E-12, a diaphragm pump (supplied by Armour Petroleum Services) P b <br /> approximately three well casing volumes of water from each. Each well was then sampled t <br /> with a Teflon bailer equipped with a bottom-emptying valve. The sample was then drained <br /> directly from the bottom valve into two 40-milliliter glass bottles with Teflon-lined septa. E . <br /> Wells E-3 and BHD-1 were not sampled during this quarter because well E-3 was dry and i <br /> well BHD-1 was damaged. <br /> The samples were stored; on ice from the time of collection through delivery to Eureka � <br /> Laboratories. All of the samples wer.., analyzed for benzene,ethylbenzene, toluene, and xylene <br /> (BETX) by U.S. Environmental Protection Agency (EPA) Method 602. Results are <br /> summarized in Table 1. The complete laboratory reports are enclosed. All groundwater <r <br /> produced during well sampling was removed from the site by Armour Petroleum Services. <br /> Constituents in the groundwater sample from well PR-1 and BHD-2 are below dBETX <br /> etection <br /> limits. The sample from monitoring well PR-2 has detectable levels of xylenes. <br /> constituents are detectable in the samples from wells E-2, E-4, E,-5, E-6, E-7, E-8, E-9, , <br /> 2,. <br /> E-l1, and E-12. In all samples, except PRA, PR <br /> _",-and 131iD-2, the benzene concentration i <br /> exceeds DHS MCLS. Y. <br /> — a <br /> 7275STREEI WHAMENTr-g1LiFORNIR 959144092.1916Y I4P0121 <br />
The URL can be used to link to this page
Your browser does not support the video tag.