Laserfiche WebLink
AMP, i:'w"'; aar:'t«— ngs .r2 is" "t,"-c:a`-' x ,.x .r�r - ;«. " - w�° ...,r ..;...• ': <br /> a` <br /> :q+{ <br /> Mr, Chuck Carmel <br /> October 9, I991 <br /> Page 3 <br /> C UgA W. lbs/dav <br /> Total Xylenes <br /> 6/12-6/26 23 0.0028 <br /> 6/27-7/10 22 0.0027 <br /> 7/11-7/24 27 00033 <br /> 7/15-8R 19 0.0023 <br /> 8/2-8/21 47 0.0058 <br /> 8/22-9/11 <0.5 10.0001 <br /> The next rnonthly status letter will include the interval September 16 through October 15, 1991. <br /> Please call Mr. Steve Misne: at (916) 444-0123 if you have any questions regarding the <br /> groundwater extraction system w ARCO Station 2133. <br /> Very truly yours, <br /> BROWN AND CALDWELL <br /> Steven D. Misner <br /> Project Manager <br /> SDM:mkw <br /> Enclosure <br /> cc: Mr.Jim Maughan, California Regional Quality Control Board <br /> Ms.Mary Meays,San Joaquin County <br /> Mr. Franc Tucker, City of Stockton <br /> Mr. Chris Winsor,ARCO Products Company <br /> Brown and Caldwell <br />