My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012554
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0012554
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:07:41 PM
Creation date
2/7/2019 11:09:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012554
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W w <br />:a <br /> Mr. Chuck Carmel <br /> June 17. 1991 <br /> Page 3 <br /> Collected effluent water sample for laboratory analysis of TTO and requested a <br /> standard two week turnaround from the laboratory. The laboratory reports for TTO <br /> are included with this letter. <br /> 518/91 Responded in writing to San Joaquin County with intent to seal well. The well was <br /> sealed on 5/20/91. The LEL sensor was relocated to a position inside the vault in the <br /> lower third of the vault. <br /> 5/20/91 Called the City with TTO sample results. Brown and Caldwell was informed that, <br /> although the results were well within the discharge limits,the City was concerned that <br /> at some time in the future the discharge concentration might be exceeded. The City <br /> requested that a proposal for some type of additional groundwater treatment be put in <br /> writ:-Iy, and that no water be discharged until after the additional groundwater <br /> treatment is installed. <br /> 6/4191 Called the City back after discussing with ARCO the City's request not to discharge. <br /> The City said that they will honor the permit and we could begin discharging again. <br /> 615191 Extraction system restarted. <br /> 6110/91 Resampled extraction system for BETX and TPH. The results of this sample are not <br /> yet available. In addition, the LEL sensors were recalibrated. <br /> The average daily flow during this reporting period was 0.35 ,aUons per minute. The total flow <br /> for this period was 22,175 gallons. af5\ ,;, <�; 1: <br /> The following is a calculation of pounds per day of each constituent. <br /> Q = Flow rate, gpm <br /> C — Concentration, pg/1 <br /> W _ Amount of chemical discharged, lbs/day <br /> W= Q x 1,440 x 8.34 x C/(I,000,000) =0.130 C at Q-fl.35 gpmdv <br /> C, PgA W lbs da <br /> TPH 3.I 0.01 <br /> Benzene 0.59 0.0013 <br /> Ethylbertzene 0.074 0.0003 <br /> Toluene 0.150 0.0006 <br /> Xylenes 0,290 0.001 <br /> Brawn and Caldwell <br />
The URL can be used to link to this page
Your browser does not support the video tag.