Laserfiche WebLink
r <br /> Mr Chuck Carmel - - <br /> November 12, 1993 <br /> Page 2 <br /> i <br /> g lb 378 1 Q gal <br /> W = C Ngll x 1,000,000 x 454 .r al x d <br /> Ing g g ay <br /> where <br /> W = Average amount of chemical discharged, lbs/day <br /> Q = Average daily flow <br /> C = Concentration pg/l <br /> The next monthly status letter will include the interval September 14, 1993 through <br /> October 14, 1993, through November 16, 1993 <br /> Please call Mr Steve Misner at (916) 444-0123 if you have any questions regarding the <br /> groundwater extraction system at ARCO Station 2133 <br /> Sincerely, <br /> BROWN AND CALDWELL <br /> RC1 "� <br /> 4,Lcu� <br /> SL D Misner J4 C Lucas <br /> Project Manager California Registered Geologist#4301 <br /> SDM JCL mdt <br /> Enclosure <br /> cc Ms Mary Meays, San Joaquin County <br /> Ms Elizabeth Thayer, Regional Water Quality Control Board <br /> Mr Frank Tucker, City of Stockton <br /> Ms Mindy Wright, Brown and Caldwell <br /> Use or disclosure of data contained on this sheet is subject to the restriction spectfted at the beginning of this <br /> document <br /> 7452%CORRLSP%7453 04 SEP <br />