My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000427
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0000427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:05:22 PM
Creation date
2/7/2019 1:35:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000427
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date July 29,2002 <br /> i, Quarter 2Q02 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 2133 Address 2908 Benjamin Holt Dr,Stockton,CA <br /> Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR/Rusty Benkosky <br /> Consultant Project No 77BP 52133 00 0802 <br /> Primary Agency/Regulatory ID No San Joaquin County Public Health Services (SJCPHS) <br /> Assembly Bill 681 Status Property owned by Atlantic Richfield Company <br /> WORK PERFORMED THIS QUARTER (Second Quarter—2002): <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> 3 Operated and maintained air sparge(AS) system <br /> WORK PROPOSED FOR NEXT QUARTER (Third Quarter - 2002): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> 3 Operate and maintain AS system <br /> 4 Perform well maintenance on monitoring wells reportedly not secured or damaged last quarter <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Protect Monitoring/Remediation <br /> Frequency of Groundwater Sampling E-2,E-8 through E-12,PR-1,BHD-1,MW-4,and MW-5 <br /> sampled quarterly,E-3 through E-7,PR-2,BHD-2,MW-1, <br /> MW-2,and MW-3 sampled 0 and 3`d quarters only <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP)Present Onsite No <br /> Cumulative FP Recovered to Date 642 lbs <br /> Cumulative TPHg removed by GWE 3,980 lbs <br /> Total groundwater extracted 32,000,000 gal <br /> Current Remediation Techniques Air S arging(AS) <br /> TPHg removed by SVE this quarter None <br /> Cumulative TPHg removed by SVE 4,897 lbs <br /> MtBE Removed this Quarter None <br /> Cumulative MtBE Removed 4 5 lbs <br /> Approximate Depth to Groundwater 7—93/4 ft <br /> Groundwater Flow and Gradient Northeast-northwest @ 0 007—0 004 ft/ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.