Laserfiche WebLink
Date April 24,2002 <br /> �1 Quarter 1Q02 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 2133 Address 2908 Benjamin Holt Dr,Stockton,CA <br /> Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR/Rusty Benkosky <br /> Consultant Project No 77BP 52133 00 0801 <br /> Primary Agency/Regulatory ID No San Joaquin County Public Health Services(SJCPHS) <br /> Assembly Bill 681 Status Property owned by Atlantic Richfield Company <br /> WORK PERFORMED THIS QUARTER (First Quarter-2002): <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> 3 Operated and maintained air sparge(AS) system <br /> WORK PROPOSED FOR NEXT QUARTER (Second Quarter - 2002): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> 2 Prepare and subnnt quarterly groundwater monitoring report <br /> �i 3 Operate and maintain AS system <br /> 4 Perform well maintenance on monitoring wells reportedly not secured or damaged last quarter <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project Monitoring/Remediation <br /> Frequency of Groundwater Sampling E-2,E-8 through E-12,PR-1,BHD-1,MW-4, and MW-5 <br /> sampled quarterly,E-3 through E-7,PR-2,BHD-2,MW-1, <br /> MW-2,and MW-3 sampled V and Pquarters only <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP)Present Onsite No <br /> Cumulative FP Recovered to Date 642 lbs <br /> Cumulative TPHg removed by GWE 3,980 lbs <br /> Total groundwater extracted 32,000,000 gal <br /> Current Remediation Techniques Air Spargxng(AS) <br /> TPHg removed by SVE this quarter None <br /> Cumulative TPHg removed by SVE 4,897 lbs <br /> MtBE Removed this Quarter None <br /> Cumulative MtBE Removed 4 5 lbs <br /> Approximate Depth to Groundwater 6--83/a ft <br /> Groundwater Flow and Gradient Northeast-northwest @ 0 002—0 004 ft/ft <br /> i� <br />