Laserfiche WebLink
• Date October 31, 2001 <br /> Quarter 3Q01 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 2133 Address 2908 Benjamin Holt Dr,Stockton,CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR/Rusty Benkosky <br /> Consultant Project No 077 43235 803 <br /> Primary Agency/Regulatory ID No San Joaquin County Public Health Services(SJCPHS) <br /> Assembly Bill 681 Status Property owned by ARCO <br /> WORK PERFORMED THIS QUARTER (Third Quarter - 2001): <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> 3 Operated and maintained air sparge(AS) system <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth Quarter - 2001.): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> 3 Operate and maintain AS system <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project Monitoring/Remediation <br /> Frequency of Groundwater Sampling E-2,E-8 through E-12,PR-1,BHD-1,MW-4,and MW-5 <br /> _sampled quarterly,E-3 through E-7,PR-2,BHD-2,MW-1, <br /> MW-2,and MW-3 sampled 1°`and 3d quarters only <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP)Present Onsite No <br /> Cumulative FP Recovered to Date 642 lbs <br /> Cumulative TPHg removed by GWE 3,980 lbs <br /> Total groundwater extracted 32,000,000 gal <br /> Current Remediation Techniques Soil-vapor extraction(SVE)/AS <br /> TPHg removed by SVE this quarter None <br /> Cumulative TPHg removed by SVE 4,897 lbs <br /> MtBE Removed this Quarter None <br /> Cumulative MtBE Removed 4 5 lbs <br /> Approximate Depth to Groundwater 83/4-11'/a ft <br /> Groundwater Flow and Gradient North-northeast @ 0 002-0 004 ft/ft <br />