My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000437
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0000437
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 3:54:06 PM
Creation date
2/7/2019 1:50:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000437
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r •1 <br /> . Date February 29,2000 <br /> Quarter 4Q99 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 2133 Address 2908 Benjamin Holt Drive, Stockton, CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR International Incorporated/Rusty Benkosky <br /> Consultant Project No 077 41727 006 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health <br /> Assembly Bill 681 Status Property Owned by ARCO Products Company <br /> WORK PERFORMED THIS QUARTER (Fourth Quarter- 1999): <br /> 1 Conducted quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater report <br /> 3 Performed operation and maintenance on remediation system <br /> WORK PROPOSED FOR NEXT QUARTER (First Quarter—2000): <br /> 1 Conducted quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater report <br /> • 3 Perform operation and maintenance on remediation system <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project Remediation and Monitoring <br /> Frequency of Groundwater Sampling E-2.E-8 through E-12 PR-1 BDH-1 MW-4 MW-5 <br /> (quarterly).E-3 through E-7 PR-2.BDH-2. <br /> MW-1,MW-2.MW-3 (1'`and 3d quarter) <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP)Present On-Site No <br /> Cumulative FP Recovered to Date 642 Munds <br /> Cumulative TPH-g removed by GWETS 3,980 pounds <br /> Total groundwater extracted 32,000,000 allons <br /> Current Remediation Techniques SVE/AS SVE down due to high GW <br /> TPH-g removed by SUET this quarter 0 <br /> Cumulative TPH-g removed by S VES 4,815 pounds <br /> Approximate Depth to Groundwater 9 02 toll 82 <br /> Groundwater Gradient Variable <br /> DISCUSSION: <br /> TPH-g was detected in two of the rune wells sampled this quarter at concentrations of 186 ppb(MW-5) to 10,800 <br /> ppb(E-10) Benzene was reported in two wells at a maximum concentration of 2,290 ppb(E-10) MtBE was <br /> detected in three wells at concentrations ranging from 2 59 ppb(E-2)to 17,800 ppb(E-10) Groundwater <br /> elevations across the site decreased by an average of 0 2 feet this quarter No predominant groundwater flow <br /> direction existed at the site Well BHD-1 was inaccessible due to construction activities on the north side of <br /> Benjamin Holt Avenue Attachment A contains SVE/AS system operational data <br />
The URL can be used to link to this page
Your browser does not support the video tag.