Laserfiche WebLink
L1f si4 _ <br /> SOIL VAPOR EXTRACTION SYSTEM <br /> FIEF MONITORING DATA SHEETS <br /> Date _ 3- Time of Arrival <br /> Technician Time of Departure <br /> Site Engineer Rusty E.BenkoskyWas Site Engineer or substitute contacted from field? <br /> Yes No <br /> PART A GENERAL INFORMATION <br /> Site Location 2908 Benjamin Holt Drtve,Stockton,CPQ Station No,. ARCO 112133 _ Project No .,7G600-01 Ml Task 109 - <br /> Abatement Equip., Al-4 t d),- ` ( (5,) Semi No <br /> SVE Blo v V 0 T QA r/ Max AMP Rating <br /> SPG Blow f u a �.• L L _ MAX AMP Rating <br /> Telemetry <br /> Elect Meter Reading <br /> Electrical Power Z Z U <br /> Supp Fuel Meter Reading <br /> Supplemental Fuel <br /> No of WO barrels at site Z Full Empty <br /> PART B SVE SYSTEM DATA <br /> System up or down upon arrival of (If down please complete PART E) <br /> Houmieter Reading At time <br /> f) <br /> Flow Data Before Ad ustment Final Ideal RaDo <br /> %Dilution air valve open <br /> %Recirculation valve open <br /> WO Content a <br /> Vacuum @ blower(in H2O) <br /> Gago Range <br /> AMPS drawn try blower motor AMPS a� <br /> Total System Flow(A P.In H2O) <br /> Pipe Size <br /> Wen Field Air Flow(A P.in H2O) <br /> _ <br /> Pipe Size 4' <br /> Dilution Air Flow(A P."H2O) <br /> Pi Size <br /> n) <br /> FID Data WCIWOCIDF WCNVOCIDF Ideal Range <br /> System Influent my before dilution <br /> System Influent my after dilution <br /> ,system Effluent my <br /> Field Instrument used Last Calibrated <br />