My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000444
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0000444
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 3:46:58 PM
Creation date
2/7/2019 1:59:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000444
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
View images
View plain text
Date September 25, 1998 <br /> . Quarter 2Q98 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 2133 Address 2908 Benjamin Holt Drive, Stockton, CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co /Contact Person SECOR International Incorporated/Rusty Benkosky <br /> Consultant Project No 7G600-019-01 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health <br /> WORK PERFORMED THIS QUARTER (Second Quarter- 1998)- <br /> 1 Performed second quarter groundwater monitoring event <br /> 2 Repaired and restarted air sparging blower Performed O&M on air sparge system <br /> WORK PROPOSED FOR NEXT QUARTER (Third Quarter- 1998). <br /> 1 Prepare and submit second quarter 1998 groundwater monitoring report <br /> 2 Perforn-i third quarter 1998 groundwater monitoring event <br /> 3 Perform O&M on air sparge system <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project Remediation (Assmnt, Remed ,etc) <br /> Frequency of Groundwater Sampling E-2, E-8 through E-12, PR-1,BDH-1,__ (Quarterly,etc) <br /> MW-4,MW-5 (quarterly), <br /> E-3 through E-7 PR-2 BDH-2 <br /> MW-1 MW-2 MW-3 I"and <br /> 3rd quarter) <br /> Frequency of Groundwater Monitoring Quarterly (Monthly, etc} <br /> Is Free Product(FP)Present On-Site No (Yes/No) <br /> Cumulative FP Recovered to Date 642 (gallons) <br /> Cumulative TPH-g removed by GWETS 3,980 (pounds) <br /> Total groundwater extracted 32,00-0000 (gallons) <br /> Current Remediation Techniques SVE/AS (SVE/AS/FP Removal) <br /> TPH-g removed by SVET this quarter 0 (pounds) <br /> Cumulative TPH-g removed by SVET 4,815 (pounds) <br /> Approximate Depth to Groundwater 5 91 to 8 66 (Measure Feet) <br /> Groundwater Gradient Radial (Direction) <br /> 0 008 to 0 011 (Magnitude) <br /> DISCUSSION <br /> TPH-g and benzene were detected in two of the eight wells sampled this quarter with maximum <br /> concentrations of 15,000 ppb (Well E-10) and 110 ppb (Well E-10), respectively MtBE was <br /> detected in three wells at a maximum concentration of 19,000 ppb in Well E-10 Groundwater <br /> elevations across the site decreased by an average of 1 96 feet this quarter, and the gioundwater <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).