My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000445
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0000445
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:37:39 PM
Creation date
2/7/2019 2:02:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000445
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date June 30, 1998 <br /> Quarter 1Q98 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 2133 Address 2908 Benjamin Holt Dr, Stockton, CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR International Incorporated/Rusty Benkosky <br /> Consultant Project No 7G600-019-01 <br /> Pnmary Agency/Regulatory ID No RWQCB <br /> WORK PERFORMED THIS QUARTER (First Quarter- 1998) <br /> 1 Performed first quarter groundwater monitoring event <br /> WORK PROPOSED FOR NEXT QUARTER (Second Quarter- 1998) <br /> 1 Prepare and submit first quarter 1998 groundiraier monitoring report <br /> 2 Perform second quarter 1998 groundwater monitoring event <br /> 3 Repair and restart air spargrng blower Perform O&M on air sparge system <br /> QUARTERLY RESULTS SUMMARY <br /> . Current Phase of Project Remedialion (Assmnt, Remed, etc) <br /> Frequency of Groundwater Sampling _F.-2, E-8 through E-1.2,PR-1, BDH-l. (Quarterly, etc) <br /> MW-4 MW-5 uarterl <br /> E-3 through E-7 PR-2 BDH-2 <br /> MW-1 MW-2 MW-3 1"and <br /> 3rd ctuarler) <br /> Frequency of Groundwater Monitoring QuarterIv (Monthly, etc) <br /> Is Free Product(FP)Present On-Site No (Yes/No) <br /> Cumulative FP Recovered to Date 624 (gallons) <br /> Cumulative TPH-g removed by GWETS 3,980 (pounds) <br /> Total groundwater extracted 32,000,000 (gallons) <br /> Current Remediation Techniques SVE/AS (SVE/AS/FP removal) <br /> TPH-g removed by SUET this quarter 0 (pounds) <br /> Cumulative TPH-g removed by SUET 4,815.__. (pounds) <br /> Approximate Depth to Groundwater 3 92 to 6 03 (Measure Feet) <br /> Groundwater Gradient Radial (Direction) <br /> 0 005 (Magnitude) <br /> DISCUSSION <br /> TPH-g was detected in five of the twenty wells sampled this quarter with a maximum concentration of 7,300 ppb <br /> . in well E-IO Benzene was detected in five wells at maximum concentration 2,000 ppb in â–ºyell E-10 MtBE was <br /> detected in six wells a maximum concentration of 32,000 ppb in well E-10 Groundwater elevations across the <br /> site increased by an average of 6 23 foot this quarter and (lie groundwater flow was radial Histoncally, the <br /> groundwater flow has been reported to be to the norlheast <br />
The URL can be used to link to this page
Your browser does not support the video tag.