My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000446
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0000446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 3:38:10 PM
Creation date
2/7/2019 2:02:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000446
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> • Facility 2133 Address 2908 Benjamin Holt Dr Stockton California <br /> ARCO Environmental Engineer Mr Paul Supple <br /> Consulting Co/Contact Person Brown and Caldwell/Steve Misner((916)444-0123 <br /> Consultant Project No 4757 <br /> Primary Agency/Regulatory ID No Central Valley RWQCB, San Joaquin County/Site <br /> Code 1021 <br /> WORK PERFORMED THIS QUARTER(Fourth- 1997) <br /> 1 Conducted groundwater monitoring/sampling for fourth quarter of 1997 Work conducted by Brown <br /> and Caldwell (BC) <br /> 2 Submitted groundwater monitoring report for third quarter of 1997 <br /> 3 Operated air sparging (AS) system AS system shut down on November 12, 1997 due to burned-out <br /> motor Did not operate soil vapor extraction and treatment system (SVET) due to low influent <br /> concentrations and high groundwater levels <br /> WORK PROPOSED FOR NEXT QUARTER(First- 1998) <br /> 1 Submit fourth quarter 1997 groundwater monitoring report <br /> 2 Conduct groundwater monitoring/sampling,for first quarter of 1998 <br /> 3 Restart AS system Restart SVET system, if influent concentrations warrant <br /> QUARTERLY RESULTS SUMMARY <br /> Current phase of project Monitoring/remediation (SVET/ASS (Assmnt, remed ,etc) <br /> Frequency of groundwater sampling E-2, E-8 through E-12, PR-I, BHD-1, (Quarterly, etc) <br /> MW-4, MW-5 = quarterly E-3 <br /> through E-7, PR-2, BHD-2, MW-1, <br /> MW-2, MW-3=semi-annually <br /> Frequency of groundwater monitoring Quarterly (Monthly, etc) <br /> Is free product(FP)present on-site No (Yes/no) <br /> FP removed this quarter None (Gallons) <br /> Cumulative FP recovered 624 (Gallons) <br /> Cumulative TPH-G removed by GWETS 3980 (Pounds) <br /> Total groundwater extracted 32,000,000 (Gallons) <br /> Current remediation techniques SVET/AS (SVET/AS/FP Removal, etc) <br /> TPH-G removed by SVET this quarter 0 (Pounds) <br /> Cumulative TPH-G removed by SVET 4815 (Pounds) <br /> Approximate depth to groundwater 10 12(PR-2)to 12 85 (E-11) (Measure feet,below TOG) <br /> General groundwater flow direction North northeast to northeast (North, northeast,etc) <br /> Approximate hydraulic gradient 0 0006 to 0 005 (Feet per foot) <br /> This report was prepared in accordance with the standards of the environmental consulting industry at the time it was <br /> prepared It should not be relied upon by parties other than those for iPhom it was prepared and then only to the extent <br /> of the scope of work which was authori_ed This report does not guarantee that no additional environmental <br /> contamination beyond that described in this report exists at the site <br /> 47571REPORT514Ti-i97QTR DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.