My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000447
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0000447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:27:03 PM
Creation date
2/7/2019 2:03:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000447
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCO PRODUCTS COMPANY SOIL VAPOR EXTRACTION AND <br /> TREATMENT (SVETS) AND AIR SPARGING (AS) SYSTEMS OPERATING REPORT <br /> Third Quarter 1997 <br /> Facility 4 2133 <br /> Facility address 2908 Benjamin Holt Dr Stockton, CA <br /> ARCO engineer Mr Paul Supple <br /> Consultant [project manager] Brown and Caldwell (Steve Misner, (916)444-0123] <br /> Lead agency San Joaquin County Health Department <br /> Reporting period 6/30/97-9/16/97 <br /> Equipment inventory Atrex KATOX 100 <br /> catalyst module <br /> 10 hp Baldor Motor 240V, 1 phase <br /> Gast Oilless Regenerative Blower <br /> ATI telemetry system <br /> Knockout pot <br /> MD Pneumatics sparge blower <br /> The SVETS was not operated this quarter due to low influent concentrations to the oxidizer as a result of <br /> high groundwater levels The SVETS was started briefly on 7/10197 and 8113197 to check influent <br /> concentrations which were 4 8 ppm and 6 9 ppm after two hours of operation The air spargmg system is <br /> fully operational j <br /> Operating mode Catalytic Oxidation <br /> AQMD Permit 0, AM N-78-3-0 <br /> End of period date 9/16/97 <br /> Soil vapor extraction system Influent Summary <br /> TPH cone end of period(PID,ppmv) 6 9 (8113/97) <br /> Flowrate end of period(cfm) 0 <br /> Total system vacuum (in H2O) 0 <br /> Current well source VW-1,VW-2, VW-3 <br /> HC destroyed this period(PID, lbs) 0 <br /> HC removal rate(PID, lbs/day) 0 <br /> Operating hours this period 2 <br /> Percent up time 0% <br /> Operating hours to date 8,124 <br /> Air sparging system <br /> Operating hours this period 1,334 <br /> Percent up time 61% <br /> Total system operating hours to date 16,118 <br /> Table 1 Soil Vapor Extraction and Treatment System Influent Data <br /> Table 2 Soil Vapor Extraction and Treatment System Effluent Data <br /> Table 3 Soil Vapor Extraction Well Data <br /> Table 4 Air Spargmg Well Data <br /> Table 5 Dissolved Oxygen Concentrations <br /> Chart 1 TPH-G Concentrations vs Time <br /> 40 Chart 2 Cumulative Hydrocarbons(as TPH-G) Removed vs Time <br />
The URL can be used to link to this page
Your browser does not support the video tag.