Laserfiche WebLink
• Table 3 Analytical Results for <br /> ARCO Facility 2133,Stockton,California <br /> Monitoring well Water-level <br /> number and Concentrations to elevation, <br /> date sampled Benzene Toluene Eth lbenzene Xylenes TPH-G(a) in feet(b) <br /> 9117190 -- -- <br /> -- -- -- -1700 <br /> 9/19/90 <0 5 <0 5 <0 5 <0 5 <50 -1700 <br /> 2/11/91 <0 5 <0 5 <0 5 <0 5 <50 -1617 <br /> 2/25/91 -- -- -- -- -- -1613 <br /> 4123/91 -- -- -- -- -- -1519 <br /> 7/16/91 <0 5 <0 5 <0 5 <0 5 <50 -1757 <br /> 10/9/91 -- -- -- -- -- -1817 <br /> 1/22/92 <0 5 <0 5 <0 5 <0 5 <50 -1652 <br /> 4122/92 <0 5 <0 5 <0 5 <0 5 <50 -1564 <br /> 7129192 <0 5 <0 5 <0 5 <0 5 <50 -1724 <br /> 10/29/92 <0 5 <0 5 <0 5 <0 5 <50 -1766 <br /> 1127/93 <0 5 <0 5 <0 5 <0 5 <50 -1434 <br /> 4/29193 <0 5 <0 5 <0 5 <0 5 <50 -1254 <br /> 8/5193 <0 5 <0 5 <0 5 <0 5 <50 -1412 <br /> 11/9/93 <0 5 <0 5 <0 5 <0 5 <50 -1418 <br /> 3/21/94 <0 3 <0 3 <0 3 <0 5 <10 -1365 <br /> 6/27/94 <0 3 <0 3 <0 3 <0 5 <10 -1357 <br /> 9/29194 <0 5 <0 5 <0 5 <0 5 <50 -1476 <br /> 12/8/94 <0 5 <0 5 <0 5 <0 5 <50 -1441 <br /> 3/8/95 <0 5 <0 5 <0 5 <0 5 <50 -1190 <br /> 611/95 <0 5 <0 5 <0 5 <0 5 <50 -1044 <br /> 9/11/95 <0 5 <0 5 <0 5 <0 5 <50 -1261 <br /> 12/5/95(h) -- -- -- -- -- -1299 <br /> 3/19/96 <0 5 <0 5 <0.5 <0.5 <50 -7.80 <br /> BHD-1 <br /> 8/26/88 6050 220 2000 1000 __ _- <br /> 11/28/88 1870 <100(c) 480 100 <br /> 2/27/89 -- -- -- -- - -- <br /> 5/30/89 2900 120 870 780 <br /> 8122189 1450 300 890 1170 <br /> 1214189 1400 170 1600 2800 -- -- <br /> 1/4/90 -- -- -- -- -- -15 12 <br /> 2/1/90 -- -- -- -- -1484 <br /> 2/15/90 -- -- -- -- -1481 <br /> 2/22/90 -- -- -- -- -- -1564 <br /> 318/90 1250 50 1870 1360 -- -1459 <br /> 4/5/90 -- -- -- -- -1480 <br /> 4/19/90 -- -- -- -- -1500 <br /> 5110/90 -- -- -- -- -- -1534 <br /> 5/24190 -- -- -- -- -1531 <br /> . 615190 -- __ __ __ <br /> 0 8 <br /> 6/18190 1180 40 20760 -1579 <br /> 3316\TABLES\2133MAR6 XLS <br />