My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1990
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
INSTALL 1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:39:31 AM
Creation date
2/7/2019 2:15:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1990
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPTION 2A <br /> ARTICLE 3. SECTION 2633/2634 <br /> MOTOR VEHICLE FUELS ONLY <br /> CONSTRUCTION <br /> • Requirements; <br /> A. Approved tank construction material <br /> B. Leak interception and detection system which complies with Article 3, <br /> Section 2631(c) . <br /> C. Membrane liners must comply with Article 3, Section 2633(e) . (1 ) . (2) 9 <br /> (3) . (4) 9 ( S) and are only allowed for piping systems (Department Policy) <br /> D. Demonstrate that the leak interception and detection systems protects <br /> ?4) , <br /> round water from contamination (Article 3, Section 2633(f) . (1 ) . (2) . (3) , <br /> (5) . (6) . (7). <br /> E. Pressurized piping systems must be installed with a leak detector that is <br /> capable of automatically shutting off the product pumps. <br /> 1 . Any single wall component "tank or piping" requires daily inventory <br /> reconci Qiation and annual precision tests as part of the monitoring <br /> program. <br /> F. Before covering, the tank(s) and system(s) must be tested to NFPA 30, <br /> Standards. <br /> G. Before use - the tank(s) and system(s) must be tested in accordance to <br /> NFPA 329. <br /> . H. Provide soil profile of vadose zone if membrane liners are used. <br /> OPTION 29 <br /> ARTICLE 3. SECTION 2634 <br /> MOTOR VEHICLE FUELS ONLY <br /> MONITORING <br /> 1 . Requirements (leak interception and detection system(s) ). <br /> A. Floor must be constructed on a firm base and sloped to a collection sump. <br /> B. Access casings must be installed in accordance to Article 3, Section <br /> 2634 (c) 0 thru 6) . (d) (l ), <br /> C. Submit written monitoring and response plan as stated in Article 3, <br /> Section 2634 (d) (1-3), 2634(e) (1_5) . <br /> D. Hard wiring of electronic monitoring systems is required. <br /> E. Provide manufacturer's written installation instructions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.