My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000461
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0000461
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 3:31:25 PM
Creation date
2/7/2019 2:17:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000461
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> f r HE rf 1 <br /> B R O W N A ` D - <br /> C A L D W E L L '' °Q <br /> September 22, 1995 <br /> Mr Kyle Christie <br /> ARCO Products Company <br /> 2155 South Bascom Avenue, Suite 202 <br /> Campbell, California 95008 017-2060-0111 <br /> Subject Status of Groundwater Extraction System, ARCO Facility 2133, <br /> Stockton, California <br /> Dear Mr Christie <br /> This letter presents the current status of the groundwater extraction system and the results of the <br /> monthly groundwater discharge sampling event for all constituents listed in the permit for <br /> ARCO Products Company (ARCO) Facility 2133, located at 2908 Benjamin Holt Drive in <br /> Stockton, California Listed below is a summary of activities and discharge of groundwater at <br /> the site from July 11 through August 22, 1995 Table 1 presents a summary of the laboratory <br /> analysis in this reporting period (The complete laboratory report for this reporting period is <br /> • included in Attachment A) <br /> 8122195 Collected effluent water sample for laboratory analysis of total petroleum <br /> hydrocarbons (EPA Method 418 1), benzene, ethylbenzene, toluene, and xylenes <br /> (EPA Methods 5030/8015 Modified/8020), and total lead (EPA Method 200 7) <br /> The total volume of water discharged during the period was 117,357 gallons The average flow <br /> rate during this period (42 days) was approximately 1 9 gallons per minute The average daily <br /> flow was 2,794 gallons <br /> Table 2 presents the average pounds per day of each constituent discharged to the sanitary sewer <br /> The quantity of hydrocarbons being discharged is in compliance with the City of Stockton <br /> Wastewater Discharge Permit issued for this site The constituent quantities were calculated <br /> using the following formula <br /> g lb 3781 Q gal <br /> W = C µg/ L x x 1,000,000 µg 454 g x gal x day <br /> where <br /> • W = Average amount of chemical discharged, lbs/day <br /> Q = Average daily flow <br /> C = Concentration µg/L <br /> Environmental Engineer ng rind Corsulting AnalybCa1 Sery+Ces <br /> 206"0RRFSPAUG95DOC 9616 MICRO` AkEN E SCBE 600 S7CKOIENLU Ca 9?327 2627 <br /> (9161 444 0 12 3 F 9 16} 8)6 )2 7 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.