Laserfiche WebLink
0 <br /> Mr Kyle Christie <br /> May 15, 1995 <br /> Page 4 <br /> efficiency The catalyst was taken to the lab for testing and on March 28, 1995, a <br /> reconditioned catalyst was installed, the heater was rebuilt. and the system restarted The <br /> system was down another 3 days during the quarter due to power outages at Facility 2133 <br /> During the first quarter, the system extracted and treated approximately 473 pounds of TPH-G <br /> and 3 2 pounds of benzene See Tables 5 and 6 for a summary of the SVE/AS system data <br /> The SUES analytical results are included in Exhibit C <br /> SUMMARY OF WORK <br /> Work Completed in First Quarter 1995 <br /> • Continued monitoring of the GWES and SVE/AS system, including sampling <br /> • Submitted fourth quarter 1994 groundwater monitoring and remediation system <br /> evaluation report. <br /> • Sampled site groundwater monitoring wells for first quarter 1995 Sampling <br /> performed by EMCON <br /> • Submitted wastewater discharge reports to the City of Stockton <br /> Work Anticipated During Second Quarter 1995 <br /> • Continue monitoring and optimizing of the GWES and SVE/AS system, including <br /> sampling <br /> • Submit fust quarter 1995 groundwater monitoring and remediation system evaluation <br /> report. <br /> • Sample groundwater monitoring wells for second quarter of 1995 <br /> • Prepare monthly wastewater discharge reports for City of Stockton <br /> • Isolate and estimate radius of influence for individual soil vapor extraction wells. <br /> • Install an electronic au sparging timer on the SVE/AS system <br />• Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this <br /> document <br /> 206012EP0RTSM ST)5QTR= <br />