Laserfiche WebLink
ENCROACHMENT PERMIT GENERAL PROVISIONS page 2 of <br /> TR 0045(REV 12/93) Back <br /> 16 CARE OF DRAINAGE Permittee shall provide aiti-mate drainage. for any work interfering with an existing drainage facility <br /> in compliance with the Standard Speciticattons Standard flans and/or as directed by the Departments Representative <br /> 17 RESTORATION AND REPAIRS IN RIGHTS OF WAY Permittee is responsible for maintenance and repairs of damage to <br /> all State owned and non-highwav permitted facihtieti within State Highwav rights of way and for restoration of State Highway <br /> rights of wav resulting from permitted work per Seetions 7 1 11 &8 1 10 of the State Standard Specifications <br /> 18 RIGHTOFWAYCLEANUP UponcompletionritworkPermitteeshallremoveentirelyanddisposeofallscraps,brush timber <br /> materials,etc,off the rights of wav The aesthetics of the highwav shall be as it was before work started <br /> 19 COST OF WORK Unless stated in the permit or separate written agreement all cost~incurred for work within State rights of <br /> way pursuant to this encroachment permit shall be borne entirely by the Permittee Permittee hereby waives all claims for <br /> indemnification or contribution from the State for any such work <br /> 20 ACTUAL COST BILLING When Permittee is to be billed actual costs(as indicated on the face of the permit),such costs will <br /> be at the currently set hourly rate for encroachment permits <br /> 21 AS-BUILT PLANS When required Permittee shail submit one(1)set of as-built plans in compliance with Department <br /> requirements Plans shall be submitted within thirty(30)days after completion and approval of work <br /> 22 PERMITS FOR RECORD PURPOSES ONLY When work in rights of way is within an area under Joint Use Agreement(JUA) <br /> or a Consent of Common Use Agreement(CCUA) an Exempt Permit will be issued to the Permittee for the purposeof providing <br /> a notice and record of work All prior rights shall be fully protected no new or different rights or obligations are intended to be <br /> created Notice and Record Purposes Only shall be stamped across the face of the permit <br /> 23 BONDING Permittee shall file necessary bond(s)in advance,in the amount set by the Department Failure to maintain bond(s) <br /> in full force and effect will result in suspension of all work and permit(s) Bonds are not required of public corporations or <br /> privately owned utilities,unless said Permittee failed to comply with the provisions and conditions under a prior permit The <br /> surety company will be responsible for any latent defects until such time as is provided for in California Code of Civil Procedures, <br /> Section 337 15 <br /> 24 FUTURE MOVING OF INSTALLATIONS Permit tee u riderstands and agrees that whenever State construction,reconstruction <br /> or maintenance work on the highway requires a permitted installation to be rearranged,the Permittee at his sole expense,upon <br /> request of the Department(unless under a prior agreement,JUA/CCUA),shall comply with said request <br /> 25 ARCHAEOLOGICAL. Should any archaeological resources be revealed in the work vicinity,the Permittee is responsible for, <br /> notifying the Department s Representative immediately,and retainment of a qualified archaeologist who shall evaluate the <br /> archaeological site and make recommendations to the Department Representative regarding the continuance of work <br /> 26 PREVAILING WAGES Work performed by or under a permit may require Permittee s contractors and subcontractors to pay <br /> appropriate prevailing wages as set by the Department of Industrial Relations Inquiries or requests for interpretations relative <br /> to enforcement of prevailing wage requirements should be directed to State of California Department of Industrial Relations,525 <br /> Golden Gate Avenue,San Francisco,California 94102 <br /> 27 RESPONSIBILITY FOR DAMAGE Your attention is directed to State of California Standard Specifications,Section 7-1 12 <br /> 28 NO PRECEDENT ESTABLISHED This permit is issued with the understanding that it does not establish a precedent <br /> 29 NONDISCRIMINATION Your attention is dirmted to State of California Standard bpecificahons,SeLtion 7-1 OIA <br />